Tender Details
Particulars | Details |
---|---|
Title |
Plantation Of Trees On Both Sides Of The Road In Jurisdictions Of Sub Division Sudhagad Pali ,District Raigad Under P.W. Division Alibag Along With Maintenance And Repair For 3 Years
|
Description |
Plantation Of Trees On Both Sides Of The Road In Jurisdictions Of Sub Division Sudhagad Pali ,District Raigad Under P.W. Division Alibag Along With Maintenance And Repair For 3 Years
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1105486_1 |
Reference Number |
Notice No.33 for 2024-25/ AD/Tender/ 5196/2024/3 |
Tender Fee | 1090 |
EMD | 16000 |
Tender Value | |
Place | S |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1930345 |
Start Date | October 05, 2024 14:30 |
End Date |
10/10/2024 ( Expired 242 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of bridge on pathri roh river at hettampur, km 3 of roshanabad-biharigarh motor road in the assembly constituency bhel ranipur in haridwar district under c.r.i.f
Construction of bridge on pathri roh river at hettampur, km 3 of roshanabad-biharigarh motor road in the assembly constituency bhel ranipur in haridwar district under c.r.i.f
Read moreSpecial repair of various link roads in mc shri hargobindpur sahib in district gurdaspur including 5 years maintenance group no.3
Special repair of various link roads in mc shri hargobindpur sahib in district gurdaspur including 5 years maintenance group no.3
Read moreSpecial repair of various link roads in mc qadian including 5 years maintenance in district gurdaspur group no.3
Special repair of various link roads in mc qadian including 5 years maintenance in district gurdaspur group no.3
Read moreSpecial repair of various link roads in mc kahnuwan including 5 years maintenance in district gurdaspur group no.3
Special repair of various link roads in mc kahnuwan including 5 years maintenance in district gurdaspur group no.3
Read moreUrgent repair works 8.500 kmp to 16.500 kmp in patches gopalchak - talla road under haldia construction sub division - i, in the district of purba medinipur in the year 2025-2026
Urgent repair works 8.500 kmp to 16.500 kmp in patches gopalchak - talla road under haldia construction sub division - i, in the district of purba medinipur in the year 2025-2026
Read moreRate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iiijammu during the fin yr 2025-26 or till next tender is finalized.
Rate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iii jammu during the fin yr 2025-26 or till next tender is finalized.
Read moreMending damages of potholes at different locations on link road (jhargram jamboni road to parihati-jamboni-fekoghat road) in between chainage 0.00 kmp to 3.50 kmp under jhargram division, pwd in the district of jhargram.
Mending damages of potholes at different locations on link road (jhargram jamboni road to parihati-jamboni-fekoghat road) in between chainage 0.00 kmp to 3.50 kmp under jhargram division, pwd in the district of jhargram.
Read moreof your Industry type