Tender Details

Particulars Details
Title
Renewal Work Of Km 2.50 Gura Barela Karauri Saidpur Road To Phulchai Sampark Marg Km 1(900), 2(800), 3(900), 4(360) Under Dataganj Vidhansabha District Budaun
Description
Renewal Work Of Km 2.50 Gura Barela Karauri Saidpur Road To Phulchai Sampark Marg Km 1(900), 2(800), 3(900), 4(360) Under Dataganj Vidhansabha District Budaun
Organisation Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT
Tender Id 2025_CEBLY_997450_1
Reference
Number
284(9)/7 Nivida(PD) E-Tender-08/24-25 15-01-25
Tender Fee 2714
EMD 4 Lakh
Tender Value
Place Budaun
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1769592
Start Date January 24, 2025 15:30
End Date

05/02/2025 ( Expired 104 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k

Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k

Read more
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Read more
Wbpwd/pw(r)/sepd/piu-i/nit-06 of 2025-2026,sl-1

Dhulagarh -jujursah- ekabbarpur road, from 0.00 kmp to 9.00 kmp, widening and strengthening work under howrah highway division in the district of howrah under ridf -xxx.(2nd call)

Read more

Nirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.

Read more
Rectification work of 1 wss under package 4 to konnigramapanchayathin pathanamthitta district

Rectification work of 1 wss under package 4 to konnigramapanchayathin pathanamthitta district

Read more
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)

Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)

Read more
Renewal work by sdbc in additional km 63, 65, 66, 67, 68, 69, 70, 71 and 72 (150mtr) of haripur-ichhadi kuwanu meenus motor road (sh-21) under annual repair year 2025-26 in chakrata constituency of dehradun district. (total length 8.150 km)

Renewal work by sdbc in additional km 63, 65, 66, 67, 68, 69, 70, 71 and 72 (150mtr) of haripur-ichhadi kuwanu meenus motor road (sh-21) under annual repair year 2025-26 in chakrata constituency of dehradun district. (total length 8.150 km)

Read more
Construction work of link motor road from village tyuna to village mangtaad of tyuni chakrata motor road in chakrata constituency of dehradun district under c.m. ghosna-171/2024. (second phase stage-1) chainage 0.00 to 1.525

Construction work of link motor road from village tyuna to village mangtaad of tyuni chakrata motor road in chakrata constituency of dehradun district under c.m. ghosna-171/2024. (second phase stage-1) chainage 0.00 to 1.525

Read more
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.

Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise