Tender Details

Particulars Details
Title
Removal Of Accumulated Spilled Coal, Mud, Slime Etc. Surrounding The B/C No. 52, 66, 74, 79, 136, 138, 143, 144, 180, 181, 201 And B/C No.202 Of Primary Crusher, Secondary Crusher And Raw Coal Bunker Upto Hms Top Section At Kathara Washery
Description
Removal Of Accumulated Spilled Coal, Mud, Slime Etc. Surrounding The B/C No. 52, 66, 74, 79, 136, 138, 143, 144, 180, 181, 201 And B/C No.202 Of Primary Crusher, Secondary Crusher And Raw Coal Bunker Upto Hms Top Section At Kathara Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_324832_1
Reference
Number
PO/KTW/EnM/eTen/24-25/148 Dated-03.01.2025
Tender Fee 0
EMD 9700
Tender Value
Place Kathara Washery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336717
Start Date January 04, 2025 16:30
End Date

14/01/2025 ( Expired 98 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Removal of accumulated spilled coal, mud, slime etc. surrounding the b/c no. 52, 66, 74, 79, 136, 138, 143, 144, 180, 181, 201 and b/c no.202 of primary crusher, secondary crusher and raw coal bunker upto hms top section at kathara washery

Removal of accumulated spilled coal, mud, slime etc. surrounding the b/c no. 52, 66, 74, 79, 136, 138, 143, 144, 180, 181, 201 and b/c no.202 of primary crusher, secondary crusher and raw coal bunker upto hms top section at kathara washery

Read more
A)dismantling, fitting, repairing and overhauling of gs-55 gear box of 180 belt conveyor and b)repairing, dismantling and fitting of bearing block with bearing no. 22220ek in head snub drum of unit no. 79 b/c in raw coal section of kathara washery

A)dismantling, fitting, repairing and overhauling of gs-55 gear box of 180 belt conveyor and b)repairing, dismantling and fitting of bearing block with bearing no. 22220ek in head snub drum of unit no. 79 b/c in raw coal section of kathara washery

Read more
Re-handling of spilled raw coal /slurry from head drum to tail drum, under and around take-up pulley of 133a, ground floor of secondary crusher house and accumulated on the gantry, beside the gantry and take-up area of 116aandb b/c of pw of kw.

Re-handling of spilled raw coal /slurry from head drum to tail drum, under and around take-up pulley of 133a, ground floor of secondary crusher house and accumulated on the gantry, beside the gantry and take-up area of 116aandb b/c of pw of kw.

Read more
A)repairing of connecting shaft size 1700 x 100 mm and 02 nos. coupling of unit no. 138 shuttle conveyor and b)repairing and changing of head snub drum shaft, hubs and its shell of unit no. 136 in raw coal section of kathara washery

A)repairing of connecting shaft size 1700 x 100 mm and 02 nos. coupling of unit no. 138 shuttle conveyor and b)repairing and changing of head snub drum shaft, hubs and its shell of unit no. 136 in raw coal section of kathara washery

Read more
Dismantling of head drum of unit no. 52 b/c, head drum of unit no. 74 b/c then fabrication, erection and installation of its supporting structure in raw coal section of kathara washery

Dismantling of head drum of unit no. 52 b/c, head drum of unit no. 74 b/c then fabrication, erection and installation of its supporting structure in raw coal section of kathara washery

Read more
Fabrication and erection of structure of unit no. 201, 52, 74 and 66 b/c of raw coal section of kathara washery

Fabrication and erection of structure of unit no. 201, 52, 74 and 66 b/c of raw coal section of kathara washery

Read more
Removal of accumulated spilled coal slim, mud etc. near surrounding the b/c no. 949 and b/c 950 of rlb section at kathara washery

Removal of accumulated spilled coal slim, mud etc. near surrounding the b/c no. 949 and b/c 950 of rlb section at kathara washery

Read more
Fabrication and erection of a) motor base structure its channel angle plate etc of unit no. 79 and b) fabrication and erection of discharge chute its channel angle plate etc of unit no. 201 in raw coal section at kathara washery

Fabrication and erection of a) motor base structure its channel angle plate etc of unit no. 79 and b) fabrication and erection of discharge chute its channel angle plate etc of unit no. 201 in raw coal section at kathara washery

Read more
Complete repairing/making of bearing housing and its block etc. of tail drum of unit no. 52 b/c and 79 b/c in raw coal section of kathara washery

Complete repairing/making of bearing housing and its block etc. of tail drum of unit no. 52 b/c and 79 b/c in raw coal section of kathara washery

Read more
1. a) repairing of double roll crusher wheel bore and its shaft and key left side in raw coal section b) repairing of 32 nos. roller and 15 nos. roller frame fitting in unit no. 136 and 138 shuttle conveyor of raw coal at kathara washery 2. dismantli

1. a) repairing of double roll crusher wheel bore and its shaft and key left side in raw coal section b) repairing of 32 nos. roller and 15 nos. roller frame fitting in unit no. 136 and 138 shuttle conveyor of raw coal at kathara washery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise