Tender Details

Particulars Details
Title
76/2025 26/Ee T/Tvm
Description
Construction Of Branch Office For National Centre Of Diseases Control At Iranimuttom, Trivandrum Sh: Construction Of Brick Compound Wall On Rr Masonry Foundation On Both Sides
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 146721
Reference
Number
76/2025-26/EE-T/TVM
Tender Fee 0
EMD 30260
Tender Value -
Place
Link
View Original Tender Notice

https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243134363732312437362f323032352d32362f45452d542f54564d

Start Date March 12, 2026 18:57
End Date
Expired 19/03/2026

Expired 209 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of brick masonary side drain from rd 11.20 to 11.90 both sides (1400 mtr) on faizabad seehma kanina road km 0 to 28.84 (mdr-127) road in mohindergarh distt (road id 2596)(ateli constituency) (w.p. 2026-27) (g-1) (rs. 51.09 lakh)

Construction of brick masonary side drain from rd 11.20 to 11.90 both sides (1400 mtr) on faizabad seehma kanina road km 0 to 28.84 (mdr-127) road in mohindergarh distt (road id 2596)(ateli constituency) (w.p. 2026-27) (g-1) (rs. 51.09 lakh)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Kiifb 2017 18 construction of kumbalangi keltron ferry bridge in ekm dt tender cum auction of compound wall with rr masonry for foundation superstructure with solid masonry gate cabin keltron side

Compound wall with random rubble masonry for foundation superstructure with solid masonry steel reinforcement gate with gi tubular security cabin roof with steel sheet ms flat in sy no 307 1 3 6

Read more
Kiifb 2017 18 construction of kumbalangi keltron ferry bridge in ekm dt tender cum auction of compound wall with rr masonry for foundation superstructure with solid masonry , gate cabin kumbalanghi side

Compound wall with random rubble masonry for foundation length of 138.6m with gate and superstructure with brick work in sy.no.1862 10 sy.no.732 7,sy.no.734 13 sy.no.734 10 sy.no.732 5

Read more
Providing rr masonry compound wall for closing the gate no.6 at the peripheral compound at ttps

Providing rr masonry compound wall for closing the gate no.6&amp#x0d at the peripheral compound at ttps

Read more
Belrayan extension of both sides mini cane carrier roofing shed with column foundation

Belrayan extension of both sides mini cane carrier roofing shed with column foundation

Read more
Construction of rr masonry compound wall for the connectivity of cprr road in kamarajar port limited

Construction of rr masonry compound wall for the connectivity of cprr road in kamarajar port limited

Read more
Provision of rr masonry retaining wall with compound wall at various places in dolphin hill , visakhapatnam

Provision of rr masonry retaining wall with compound wall at various places in dolphin hill , visakhapatnam&#x0d

Read more