Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bulk Lpg Transportation Contract By Road For The State Of Karnataka
|
Description |
Bulk Lpg Transportation Contract By Road For The State Of Karnataka
|
Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
Tender Id | 2025_BPCL_20110 |
Reference Number |
1000000000LPG/BULK/TT/BPC/KARNATAKA/2025-30 |
Tender Fee | 0 |
EMD | 25000 |
Tender Value | |
Place | Mumbai |
Link | https://bpcltenders.eproc.in |
Start Date | March 01, 2025 16:30 |
End Date |
09/05/2025 ( Expired 53 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of bulk pol products ex gulbarga
Transportation of bulk pol products ex gulbarga
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreEoi of meeut terminal
Expression of interest for road transportation of bulk petroleum
 products ms/ hsd/ branded fuels for dealers/consumers (top loading)
 for meerut terminal
Read moreEoi of aonla depot( bareilly)
Expression of interest for road transportation of bulk petroleum
 products ms/ hsd/ branded fuels for dealers/consumers (top loading)
 for aonla depot(bareilly)
Read moreEoi of mathura marketing terminal
Expression of interest for road transportation of bulk petroleum
 products ms/ hsd/ branded fuels for dealers/consumers (top loading)
 for mathura marketing terminal
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreShort term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreof your Industry type