Tender Details

Particulars Details
Title
Upgradation And Beautification Work Of Roads Under Cm Grid Scheme At Bareily Up From Kohadapeer Petrol Pump To Kudeshiya Bridge Via G.R.M School Phase 2
Description
Upgradation And Beautification Work Of Roads Under Cm Grid Scheme At Bareily Up From Kohadapeer Petrol Pump To Kudeshiya Bridge Via G.R.M School Phase 2
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id 2025_DOLBU_1021508_1
Reference
Number
CMGRID/1143/CE/NNB/2024-25
Tender Fee 41300
EMD 72.68 Lakh
Tender Value
Place NAGAR NIGAM BAREILLY
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1843525
Start Date March 24, 2025 17:30
End Date

07/04/2025 ( Expired 68 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.

Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.

Read more
Construction of rrc wall at service road green belt area from malviya petrol pump to robot square (both side) under garden civil department (h.q.)

Construction of rrc wall at service road green belt area from malviya petrol pump to robot square (both side) under garden civil department (h.q.)

Read more
Spl repair to roads at various location under age b/r-ii, hill road hq bldg and approach road of div hq camp area, hawk drive road from gym to div hq 36 rapid(s), mango grove area and jcos/or md accn d area at vk line under ge saugor

Spl repair to roads at various location under age b/r-ii, hill road hq bldg and approach road of div hq camp area, hawk drive road from gym to div hq 36 rapid(s), mango grove area and jcos/or md accn d area at vk line under ge saugor

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx

Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx

Read more
Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme.

Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme. &amp#x0d &amp#x0d

Read more
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna

Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise