Tender Details
Particulars | Details |
---|---|
Title |
Upgradation And Beautification Work Of Roads Under Cm Grid Scheme At Bareily Up From Kohadapeer Petrol Pump To Kudeshiya Bridge Via G.R.M School Phase 2
|
Description |
Upgradation And Beautification Work Of Roads Under Cm Grid Scheme At Bareily Up From Kohadapeer Petrol Pump To Kudeshiya Bridge Via G.R.M School Phase 2
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1021508_1 |
Reference Number |
CMGRID/1143/CE/NNB/2024-25 |
Tender Fee | 41300 |
EMD | 72.68 Lakh |
Tender Value | |
Place | NAGAR NIGAM BAREILLY |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1843525 |
Start Date | March 24, 2025 17:30 |
End Date |
07/04/2025 ( Expired 68 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Construction of bridge on solani river at km 9 chainage 8.10 from roorkee to reliance petrol pump mangalore to core college road (old nh-58) under c.r.i.f.
Read moreConstruction of rrc wall at service road green belt area from malviya petrol pump to robot square (both side) under garden civil department (h.q.)
Construction of rrc wall at service road green belt area from malviya petrol pump to robot square (both side) under garden civil department (h.q.)
Read moreSpl repair to roads at various location under age b/r-ii, hill road hq bldg and approach road of div hq camp area, hawk drive road from gym to div hq 36 rapid(s), mango grove area and jcos/or md accn d area at vk line under ge saugor
Spl repair to roads at various location under age b/r-ii, hill road hq bldg and approach road of div hq camp area, hawk drive road from gym to div hq 36 rapid(s), mango grove area and jcos/or md accn d area at vk line under ge saugor
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreInstallation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx
Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx
Read moreUnder iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme.
Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme. &#x0d &#x0d
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type