Tender Details

Particulars Details
Title
Upgradation And Beautification Work Of Roads Under Cm Grid Scheme At Bareily Up From Kohadapeer Petrol Pump To Kudeshiya Bridge Via G.R.M School Phase 2
Description
Upgradation And Beautification Work Of Roads Under Cm Grid Scheme At Bareily Up From Kohadapeer Petrol Pump To Kudeshiya Bridge Via G.R.M&Amp#X0d School Phase 2
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id 2025_DOLBU_1004627_1
Reference
Number
CM GRID 1081/ CE/NNB/2024-25
Tender Fee 41300
EMD 72.68 Lakh
Tender Value
Place Nagar Nigam Bareilly
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1796934
Start Date February 10, 2025 23:30
End Date

11/03/2025 ( Expired 65 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)

R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)

Read more
Chambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25

Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm

Read more
Drain and c.c. road construction work in vinayak nagar in front of leela garden in ward 88 k nagar from shaudan to udaybhan, from arjun diwakar to pawan gautam via pandit, from ganga garden to jeevan lal in front of primary school.

Drain and c.c. road construction work in vinayak nagar in front of leela garden in ward 88 k nagar from shaudan to udaybhan, from arjun diwakar to pawan gautam via pandit, from ganga garden to jeevan lal in front of primary school.

Read more
Cement concrete work and other necessary work from gyarah banglow colony gate no. 01 to patrol pump at keshar bagh road mahunaka in ward no. 72 under zone no. 15 (mahapor nidhi)

Cement concrete work and other necessary work from gyarah banglow colony gate no. 01 to patrol pump at keshar bagh road mahunaka in ward no. 72 under zone no. 15 (mahapor nidhi)

Read more
Providing tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1

Providing tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1

Read more
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Supply of hiring of vechile (pick-up van 2cbm)

Supply of hiring of vehicle (pick up van 2cbm capacity) for collection of garbage from all the wards under gram panchayat brindaban and transportation/disposal to slwm cluster situate at gram panchayat brindaban

Read more
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)

Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise