Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🛣️ Invitation For Bids: Permanent Road Restoration Work 🛠️ The Municipal Affairs Department Of The State Government And Ut Invites Bids From Experienced Contractors For The Execution Of Permanent Road Restoration Work With Cement Concrete At Various Zones In Midnapore. 📅 Bid Submission Deadline: July 13, 2024, 12:00 Pm The Tender Fee Is Set At Inr 406,585. Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Work Experience, And Financial Bids, To Undertake This Significant Infrastructure Project. Keywords: Road Restoration, Cement Concrete, Infrastructure Project, Municipal Affairs Department, State Government And Ut, Tender, Bid, MidnaporeParticulars | Details |
---|---|
Title |
Parmanent Road Restoration Work With Cement Concrete At Different Zone
|
Description |
Parmanent Road Restoration Work With Cement Concrete At Different Zone
|
Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_MAD_692906_1 |
Reference Number |
WBMAD/ULB/MID/CM/eNIT179/23-24 2nd call |
Tender Fee | 0 |
EMD | 4.07 Lakh |
Tender Value | |
Place | MIDNAPORE |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1509116 |
Start Date | June 14, 2024 21:30 |
End Date |
13/07/2024 ( Expired 339 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreModification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreBalance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Balance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreImprovements to the earthen hill road for arulmigu nainamalai varadharaja perumal temple
Improvements to the earthen hill road for arulmigu nainamalai varadharaja perumal temple, nainamalai, namakkal taluk and district for a length of 7.1 km including protective works, cement concrete drain, cross drainage works and parking area
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreof your Industry type