Tender Details
Particulars | Details |
---|---|
Title |
Led Light Type 1,Led Light Type 2,Led Light Type 3,Led Light Type 4,Led Light Driver Type 1,Led Lig
|
Description |
|
Organisation | POWER GRID Corporation OF INDIA Limited | Ministry of Power |
Tender Id | GEM/2025/B/6145305 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 17, 2025 03:12 |
End Date |
16/05/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read morePhase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreSupply of 16 nos. telescopic (collapsible tower) vertical mast type portable led emergency lighting system with 0.75 kva genset (cpcb compliance) suitable for 6.4 hrs. continuous running
Supply of 16 nos. telescopic (collapsible tower) vertical mast type portable led emergency lighting system with 0.75 kva genset (cpcb compliance) suitable for 6.4 hrs. continuous running
Read moreSling 8mm x 2.5meter single wire rope s*,sling 1/2" x 2meter single wire rope so,single wire rope s
Read more
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreProcurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Read moreDesign build transit hubs cum community complex (thcc) in tadong-1 (lot 2)
Design build transit hubs cum community complex (thcc) in tadong-1 (lot 2)
Read moreof your Industry type