Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Of Dismantling Electrical/Mechanical Equipments Installed On Bhikkawala Pump Nahar (Stage Ii) And Defective Delivery Pipes, And Installing New Pipes
|
Description |
Work Of Dismantling Electrical/Mechanical Equipments Installed On Bhikkawala Pump Nahar (Stage Ii) And Defective Delivery Pipes, And Installing New Pipes
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 766 |
EMD | 23000 |
Tender Value | |
Place | Kalagarh |
Link |
AAAAAAAAAA Login to view |
Start Date | July 07, 2025 18:25 |
End Date |
26/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreFor retrofitting work of directional over current, earth fault and master trip relay on 132kv relay panel of 132kv bays at 220kv substation naubasta kanpur under etd-ii kanpur
For retrofitting work of directional over current, earth fault and master trip relay on 132kv relay panel of 132kv bays at 220kv substation naubasta kanpur under etd-ii kanpur
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreCivil and electrical renovation work at opal annexe building and installation of 7 new urinals and allied works at international hostel at iit(ism) dhanbad
Civil and electrical renovation work at opal annexe building and installation of 7 new urinals and allied works at international hostel at iit (ism) dhanbad
Read moreWork of dismantling electrical/mechanical equipments installed on bhikkawala pump nahar (stage ii) and defective delivery pipes, and installing new pipes
Work of dismantling electrical/mechanical equipments installed on bhikkawala pump nahar (stage ii) and defective delivery pipes, and installing new pipes
Read moreRemoving and relaying of top layer on existing synthetic athletic track i/c necessary repair of track and providing all competition equipments at thyagraj sports complex, new delhi during 2025-26.
Removing and relaying of top layer on existing synthetic athletic track i/c necessary repair of track and providing all competition equipments at thyagraj sports complex, new delhi during 2025-26.
Read moreSupply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta- phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513
Supply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta - phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513
Read moreConstruction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Construction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Read more06/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 25/06/2025
Construction of a new bailey bridge both ways (to and fro journey) at lake town, vip road and salt lake connector near dakshindari. (first call).&#x0d sh -for foundation and sub-structure work.&#x0d
Read moreof your Industry type