Tender Details

Particulars Details
Title
Work Of Dismantling Electrical/Mechanical Equipments Installed On Bhikkawala Pump Nahar (Stage Ii) And Defective Delivery Pipes, And Installing New Pipes
Description
Work Of Dismantling Electrical/Mechanical Equipments Installed On Bhikkawala Pump Nahar (Stage Ii) And Defective Delivery Pipes, And Installing New Pipes
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 766
EMD 23000
Tender Value
Place Kalagarh
Link

AAAAAAAAAA

Login to view
Start Date July 07, 2025 18:25
End Date

26/07/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project

Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india

Read more
Lot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.

Read more
For retrofitting work of directional over current, earth fault and master trip relay on 132kv relay panel of 132kv bays at 220kv substation naubasta kanpur under etd-ii kanpur

For retrofitting work of directional over current, earth fault and master trip relay on 132kv relay panel of 132kv bays at 220kv substation naubasta kanpur under etd-ii kanpur

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Civil and electrical renovation work at opal annexe building and installation of 7 new urinals and allied works at international hostel at iit(ism) dhanbad

Civil and electrical renovation work at opal annexe building and installation of 7 new urinals and allied works at international hostel at iit (ism) dhanbad

Read more
Work of dismantling electrical/mechanical equipments installed on bhikkawala pump nahar (stage ii) and defective delivery pipes, and installing new pipes

Work of dismantling electrical/mechanical equipments installed on bhikkawala pump nahar (stage ii) and defective delivery pipes, and installing new pipes

Read more
Removing and relaying of top layer on existing synthetic athletic track i/c necessary repair of track and providing all competition equipments at thyagraj sports complex, new delhi during 2025-26.

Removing and relaying of top layer on existing synthetic athletic track i/c necessary repair of track and providing all competition equipments at thyagraj sports complex, new delhi during 2025-26.

Read more
Supply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta- phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513

Supply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta - phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513

Read more
Construction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.

Construction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.

Read more
06/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 25/06/2025

Construction of a new bailey bridge both ways (to and fro journey) at lake town, vip road and salt lake connector near dakshindari. (first call).&amp#x0d sh -for foundation and sub-structure work.&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise