Tender Details

Particulars Details
Title
Dismantling, Stacking, Fabrication And Erection Of Pipes And Valves In Rb#3 Lime Kiln Use In Srp Mechanical
Description
Dismantling, Stacking, Fabrication And Erection Of Pipes And Valves In Rb#3 Lime Kiln Use In Srp Mechanical
Organisation Tamilnadu Newsprint and Papers Limited | TNPL Unit-1 | TNPL TOS
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD 6000
Tender Value -
Place Tamil Nadu
Link Login to view
Start Date October 15, 2026 23:30
End Date
Open 26/10/2026

10 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Overhauling of belt conveyors in lime kiln at srp mechanical in tnpl unit 1

Overhauling of belt conveyors in lime kiln at srp mechanical in tnpl unit 1

Read more
Arc for the dismantling, fabrication , erection of valves, repairing/ strengthening of worn out etc

Arc for the dismantling, fabrication , erection of valves, repairing/ strengthening of worn out etc

Read more
Dismantling, mechanical cleaning and re-erection of valves flanged and non-flanged pipes in cbp #2 at pulp mill mechanical

Dismantling, mechanical cleaning and re-erection of valves flanged and non-flanged pipes in cbp #2 at pulp mill mechanical

Read more
Dismantling, fabrication and erection of light structurals, pipelines, valves etc (outside of mill area) at energy mechanical in tnpl unit-1

Dismantling, fabrication and erection of light structurals, pipelines, valves etc (outside of mill area) at energy mechanical in tnpl unit-1

Read more
Dismantling, fabrication and erection of structurals, pipelines and valves in pulper building, main building in dip at pulp mill mechanical in tnpl unit i

Dismantling, fabrication and erection of structurals, pipelines and valves in pulper building, main building in dip at pulp mill mechanical in tnpl unit i

Read more
Replacement of cooling water pipelines of unit 1 machine with seamless carbon steel pipes at idamalayar power house including dismantling of existing pipelines supply fabrication erection installation testing commissioning

Replacement of cooling water pipelines of unit 1 machine with seamless carbon steel pipes at idamalayar power house including dismantling of existing pipelines supply fabrication erection installation testing commissioning

Read more
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada

Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Dismantling, fabrication and erection of pipelines in rb#3 and lime kiln use at srp - mechanical in tnpl unit - 1

Dismantling, fabrication and erection of pipelines in rb#3 and lime kiln use at srp - mechanical in tnpl unit - 1.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise