Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Electrical Trd Portion Of Work In Connection With Interlocking Of Lc Gate No. 07 At Kms 286/3 4 Between Ksth Sgnd Section &Amp Lc Gate No. 51 At 420/0 1 Between Bap Cit Of Solapur Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73135920 |
Reference Number |
SUR-TD-T-2024-01 |
Tender Fee | 0 |
EMD | 98700 |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73135920/viewNitPdf_4456242.pdf |
Start Date | January 19, 2024 19:37 |
End Date |
13/02/2024 ( Expired 501 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling
Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreExecution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreElectrical (g) works in connection with shifting of existing state electricity lt and ht overhead lines infringing the construction of new rob at lc gate no. gj-2 between gondia - jabalpur section and at lc gate no. tt-4, tt-5 and tt-9 between tumsar - tirodi section
For complete deion and other details, please refer to tender
Read moreWork 1:electrical general service portion of work in connection with provision of general lighting arrangement at lc 7 (km 286/3-4) in ksth-sgnd section of pune division. work 2:electrical general service portion of work in connection with provision of general lighting arrangement at lc 51 (km 420/0-1) in dd-mmr section of pune division. work 3:electrical general service portion of work in connection with extension of orh suites located sai nagar shirdi station of pune division.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge on davha sayki road lc no 08 on btbr urr section along with service road drains etc in yard adjoining to rob in connection with the wcl at mkd iii of nagpur division of c rly in the state of maharashtra span 1 x 36 m
Construction of road over bridge on davha sayki road lc no 08 on btbr urr section along with service road drains etc in yard adjoining to rob in connection with the wcl at mkd iii of nagpur division of c rly in the state of maharashtra span 1 x 36 m
Read moreS&t work in connection with 1) replacement of existing steel girders vith psc slabs for 10 bridges. 34 spans in gnt -ndl section. 2) replacement of existing steel girders with psc slabs for 9 bridges, 35 spans in gnt -ndkd-pgdp section. 3) provision of low height additional vent way of rub 138b (lc no.48) km 83/6-7 between mrga - kdgl stations. 4)provision of low height additional vent way of of rub 48a (lc no.12) km 26/2-3 between nrdp-vlga stations. 5) provision of low height additio
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works: mridcl (deposit work) (1)construction of rob at km. 662/18-19 at badnera station. (2)construction of rob & lhs in lieu of lc no. s-2 at km. 666/07-08 on badnera-amravati section. (3)construction of rub in lieu of lc no. jk-6 at km. 545k/21-22 on jalamb-khamgaon section. (4)construction of rob at rly. km. 417/23n-25n on jalgaon-shirsoli section.
For complete deion and other details, please refer to tender
Read moreHyderabad division - (1) sc-dhne section: pasr - additional loop line with simulataneous reception & despatch facility, (2) sc-dhne section: proposed construction of road under bridge (rub) in lieu of lc no: 33 at km 69/0-100 between shnr-babr stations, (3) sc-dhne section: elimination of manned level crossing gate no 65 at km 122/200-300 by providing rub between mbnr-mqn stations, (4) sc-dhne section: elimination of manned level crossing gate no. 141 at km 258/600-700 by providing rub be
For complete deion and other details, please refer to tender
Read moreRajkot division:- engineering, electrical & trd work in connection with reliability improvement of level crossing gates by provision of ips at 17 no. of lc gates (lc no. 28, 31, 69, 74, 82, 90, 136, 147, 201, 202, 236, 289, 304, 305 & 306 in viramgam - okha section, lc no. 4 in rajkot-bhaktinagar section & lc no. 31 in makansar-morvi section.
For complete deion and other details, please refer to tender
Read moreof your Industry type