Tender Details
About Tender
🚂 Procurement Opportunity: Signalling Equipment For Mumbai Railways 🚦 The Ministry Of Railways, Central Government, Invites Bids For The Technical Rehabilitation And Development (Trd) Work Associated With The Provision Of Signalling Equipment At Line Crossing (Lc) 4 And Lc 219 In The New Gate Lodge, With The Aim Of Enhancing Reliability Through The Use Of European Train Control System (Etcs) Level 2 Components. 📅 Bid Submission Deadline: July 10, 2024, 3:00 Pm A Tender Fee Of Inr 26,700 Has Been Set, With An Earnest Money Deposit (Emd) Of Inr 2,67,000. Interested Bidders Should Review The Tender Document For Complete Details And Submission Guidelines. Keywords: Ministry Of Railways, Signalling Equipment, Trd Work, Eld & Facs, Etces Level 2, Mumbai Railways, Government Tender, Procurement, Bid SubmissionParticulars | Details |
---|---|
Title |
Trd Work In Connection With Provision Of Signalling Equipment At 2 L Cs (Lc 4 And Lc 219) In New Gate Lodge And Reliability Improvement Using Eld &Amp Facs.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75626758 |
Reference Number |
DRM-RJT-EL-TRD-2024-25-02 |
Tender Fee | 0 |
EMD | 26700 |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75626758/viewNitPdf_4602319.pdf |
Start Date | June 13, 2024 16:05 |
End Date |
10/07/2024 ( Expired 286 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction work of remaining internal drains and culverts in majhola scheme no. 4 part 2 extension sector 16 of distt moradabad
Construction work of remaining internal drains and culverts in majhola scheme no. 4 part 2 extension sector 16 of distt moradabad&#x0d &#x0d
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreExpansion of new pipe
Expansion of new pipe&#x0d line net work line network in uncovered area and improvement of existing distribution network in jal shakti phe sub division kunjwani under amrut 2.0&#x0d
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreConstruction of new service road and under passes at various locations on rewa katni jabalpur km 813.257-km 880.600 (pkg-4) and improvement works at jabalpur lakhnadon (km880.600-km891.780) of nh-30 and (1358.000-km1428.557) of nh-34 in mp on epc
Construction of new service road and under passes at various locations on rewa katni jabalpur km 813.257-km 880.600 (pkg-4) and improvement works at jabalpur lakhnadon (km880.600-km891.780) of nh-30 and (1358.000-km1428.557) of nh-34 in mp on epc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreSpecial repairing works ( additional work ) in connection with establishment of regional semen production laboratory and semen bank for goat at haringhata, nadia-741246 under paschim banga go-sampad bikash sanstha
Special repairing works ( additional work ) in connection with establishment of regional semen production laboratory and semen bank for goat at haringhata, nadia-741246 under paschim banga go-sampad bikash sanstha
Read moreAddn/altn to pine cone guest room at hq 101 area (st) and provn of overhead shed with footpath from the school gate (gate-3) to primary wing and provn of cup board and wall panelling in study room at cantt-1 and provn of new carpeting and dry cleanin
Addn/altn to pine cone guest room at hq 101 area (st) and provn of overhead shed with footpath from the school gate (gate-3) to primary wing and provn of cup board and wall panelling in study room at cantt-1 and provn of new carpeting and dry cleanin
Read moreWork of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl
Work of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl
Read moreof your Industry type