Tender Details
Particulars | Details |
---|---|
Title |
Sc Division: Kzj Bza Section:1.Lc No.65:Trd Arrangements In Connection With Proposed Construction Of Rub In Lieu Of Lc No.65 (M) At Km.384/12 14 Between Wl Cle Stations 2.Lc No.68:Trd Arrangements In Connection With Proposed Construction Of Rub In Lieu Of Lc No.68(m) At Km.394/19 21 Between Cle Ygl Stations 3.Lc No.72:Trd Arrangements In Connection With Proposed Construction Of Rub In Lieu Of Lc No.72(m) At Km.408/6 8 Between Nkd Ink Stations 4.Lc No.73:Trd Arrangements In Connection With Prop
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78061191 |
Reference Number |
C-E29-TRD-36-2024-25 |
Tender Fee | 0 |
EMD | 1.13 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78061191/viewNitPdf_4749091.pdf |
Start Date | October 24, 2024 22:29 |
End Date |
18/11/2024 ( Expired 201 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreProviding led street light arrangements to the rob at km 1/6 of siruthaiyur to sengaraiyur road in lieu of existing lc no 226 at railway km 311/8-9 between kattur to lalgudi station at lalgudi in trichy district.
Providing led street light arrangements to the rob at km 1/6 of siruthaiyur to sengaraiyur road in lieu of existing lc no 226 at railway km 311/8-9 between kattur to lalgudi station at lalgudi in trichy district.
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConst. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreEngineering, procurement and construction (epc) document for construction of new railway line in km 111/150 to 124/400 in between gajrahi and deosar stations including earthwork, minor bridges, station building, tunnels (04 nos) and important bridge (01 no.) in connection with sidhi-singrauli new rail link project in the state of madhya pradesh
For complete deion and other details, please refer to tender
Read moreConstruction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Construction of limited height subway/rub near proposed rob at railway km 576/10-11 (lc no.-c61) on nh-89 (old nh) at ch. 165/550 (left out portion of nagaur-bikaner section) in the state of rajasthan on epc mode.
Read moreof your Industry type