Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Sukhpuri Ghata Road Length 7.02 Km Total Road Length 7.02 Km
|
| Description |
Construction Of Sukhpuri Ghata Road Length 7.02 Km Total Road Length 7.02 Km
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_299836_1 |
|
Reference Number |
CE 15/Gen-40/2023-24 Indore, Dated 17.08.23 |
| Tender Fee | 20000 |
| EMD | 5.13 Lakh |
| Tender Value | - |
| Place | CHIEF ENGINEER PWD WEST ZONE INDORE |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | August 18, 2023 14:30 |
| End Date |
Expired
29/08/2023
Expired 1104 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance of yalavarthi to turuvanuru road via chikkagondanahalli gollarahatti chikkagondanahalli bangarakkanahalli ch 0.00 to 5.92 km and 7.02 to 13.80 km in chitradurga taluk
Annual maintenance of yalavarthi to turuvanuru road via chikkagondanahalli gollarahatti chikkagondanahalli bangarakkanahalli ch 0.00 to 5.92 km and 7.02 to 13.80 km in chitradurga taluk
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreConstruction of road from jurgudih yatra mela dangal nh-419 main road to hisadih tola via jurgudih (1.000 km)
Construction of road from jurgudih yatra mela dangal nh-419 main road to hisadih tola via jurgudih (1.000 km)
Read moreAnnual maintenance of a) byadarahalli to bidarakere cross road via t.obenahalli, bidarakere road from km 0.00 to 6.08 km in hiriyur taluk, b) hariyabbe to suguru road via mungasavalli road from km 0.00 to 6.97 km in hiriyur taluk
Annual maintenance of a) byadarahalli to bidarakere cross road via t.obenahalli, bidarakere road from km 0.00 to 6.08 km in hiriyur taluk, b) hariyabbe to suguru road via mungasavalli road from km 0.00 to 6.97 km in hiriyur taluk
Read moreConstruction of bridge at ch.2.20 km of harave road connecting harave via ramenahalli in hunsur taluk
Construction of bridge at ch.2.20 km of harave road connecting harave via harave kalhall, ramenahalli in hunsur taluk
Read moreConstruction of bridge at 0.85 km on deshnur-mattikoppa (major district road) of kittur constituency in bailhongal taluk
Construction of bridge at 0.85 km on deshnur-mattikoppa (major district road) of kittur constituency in bailhongal taluk
Read moreAnnual maintenance of a) dasannanamalige to gownahalli cross road via bharampura, kerechikkayyanaroppa, gopalapura road from km 0.00 to 4.19 and 6.04 to 9.59 km in hiriyur taluk, b) hiriyur rural (akshaya food park) to hucchavvanahalli road from km 0.00 to 1.75 km in hiriyur taluk c) paramenahalli cross to v.s.l steel factory road from km 0.00 to 2.31 km in hiriyur taluk
Annual maintenance of a) dasannanamalige to gownahalli cross road via bharampura, kerechikkayyanaroppa, gopalapura road from km 0.00 to 4.19 and 6.04 to 9.59 km in hiriyur taluk, b) hiriyur rural (akshaya food park) to hucchavvanahalli road from km 0.00 to 1.75 km in hiriyur taluk c) paramenahalli cross to v.s.l steel factory road from km 0.00 to 2.31 km in hiriyur taluk
Read moreAnnual maintenance of a) imangala to yaraballi road via talavatti, vaddikere road from km 0.00 to 13.31 km in hiriyur taluk b) janukonda to burujanaroppa road via godabanahal, mahadevanakatte, kennadalu, chikkasiddavvanahalli, burujanaroppa road from 20.69 to 29.10 km in hiriyur taluk
Annual maintenance of a) imangala to yaraballi road via talavatti, vaddikere road from km 0.00 to 13.31 km in hiriyur taluk b) janukonda to burujanaroppa road via godabanahal, mahadevanakatte, kennadalu, chikkasiddavvanahalli, burujanaroppa road from 20.69 to 29.10 km in hiriyur taluk
Read moreof your Industry type