Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Installation Of New Slider Frame After Dismantling And Removal Of Existing Worn Out Slider Of Slidding Pulley Of Unit C 1 And C 2 Belt Conveyor At Moonidih Coal Washery.
|
| Description |
Fabrication And Installation Of New Slider Frame After Dismantling And Removal Of Existing Worn Out Slider Of Slidding Pulley Of Unit C 1 And C 2 Belt Conveyor At Moonidih Coal Washery.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_336164_1 |
|
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2025-26/E 209 |
| Tender Fee | 0 |
| EMD | 4900 |
| Tender Value | - |
| Place | MOONIDIH WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348469 |
| Start Date | May 27, 2025 14:30 |
| End Date |
Expired
04/06/2025
Expired 496 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Read moreDismantling and repairing of damaged/worn out ss liner from charging chute and removal of jammed coal from silo-2 of rajmahal chp.
Dismantling and repairing of damaged/worn out ss liner from charging chute and removal of jammed coal from silo-2 of rajmahal chp.
Read moreRepair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Read moreReplacement of take-up pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum for unit-701 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of take-up pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum for unit-701 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreReplacement of sliding pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum unit 502 and 704 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of sliding pulley drum assembly and bend pulley drum assembly after dismantling of existing worn-out drum unit 502 and 704 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreRepairing/ replacement of discharge chute after dismantling of existing worn-out discharge chute for unit 301-b belt conveyor at moonidih coal washery.
Repairing/ replacement of discharge chute after dismantling of existing worn-out discharge chute for unit 301-b belt conveyor at moonidih coal washery.
Read moreRepairing/ strengthening of 2 nos. feed chutes after dismantling of existing worn-out feed chutes for unit 903 belt conveyor at moonidih coal washery.
Repairing/ strengthening of 2 nos. feed chutes after dismantling of existing worn-out feed chutes for unit 903 belt conveyor at moonidih coal washery.
Read moreRepairing/ strengthening of base structure of head drum of unit 301-b conveyor belt along with replacement of 01 no. bend pulley drum assembly after dismantling of existing worn-out drum of moonidih coal washery.
Repairing/ strengthening of base structure of head drum of unit 301-b conveyor belt along with replacement of 01 no. bend pulley drum assembly after dismantling of existing worn-out drum of moonidih coal washery.
Read moreReplacement of the drive drum assembly for unit 402 belt conveyor and snub drum assembly for unit 903 belt conveyor after dismantling of existing worn-out drums at moonidih coal washery.
Replacement of the drive drum assembly for unit 402 belt conveyor and snub drum assembly for unit 903 belt conveyor after dismantling of existing worn-out drums at moonidih coal washery.
Read moreDismantling and removal of damaged / worn-out gearbox and installation of new gear box at drive end of unit c-2 belt conveyor at moonidih coal washery.
Dismantling and removal of damaged / worn-out gearbox and installation of new gear box at drive end of unit c-2 belt conveyor at moonidih coal washery.
Read moreof your Industry type