Tender Details

Particulars Details
Title
Widening strengthening reconstruction work (including bridge work, land acquisition and afforestation) of birni (virajpur)-kheshkhari via belna, chitankhari, taratand, baradih, jharkhi road (total length -22.215 k.m)
Description
Widening strengthening reconstruction work (including bridge work, land acquisition and afforestation) of birni (virajpur)-kheshkhari via belna, chitankhari, taratand, baradih, jharkhi road (total length -22.215 k.m)
Organisation RCD EinC | State Govt. and UT
Tender Id 2024_CECOM_85628_1
Reference Number RCD/GIRIDIH/281
Tender Fee 10000
EMD 63.35 Lakh
Tender Value
Place Giridih
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=114854
End Date

12/04/2024 ( Expired 10 days ago )

Search Similar tenders?
Similar Tenders
Widening n strengthening of road from sl to dl of sbsc road from 00 to 7.800 km including 1 no. hl bridge over magardhara nallaha at 7.500 km in the district of subarnapur

Widening n strengthening of road from sl to dl of sbsc road from 00 to 7.800 km including 1 no. hl bridge over magardhara nallaha at 7.500 km in the district of subarnapur

Read more
Special strengthening work bhonra minapur bamori vishanwada rajasthan border road (vishanwada bhonra hamirpur via kohan) km 37 to 44 and 64 to 78 length 23.10 km (mdr) and anarad to nihaldevi road length 2.80 km (total length 25.90 km)

Special strengthening work bhonra minapur bamori vishanwada rajasthan border road (vishanwada bhonra hamirpur via kohan) km 37 to 44 and 64 to 78 length 23.10 km (mdr) and anarad to nihaldevi road length 2.80 km (total length 25.90 km) first call

Read more
Strengthening (improvement) of existing road of sarangarh bypassed section including culverts from km.43.584 to 57.260 total 13.676 km. on nh-216 (new nh -153) on epc mode in the state of chhattisgarh

Strengthening (improvement) of existing road of sarangarh bypassed section including culverts from km.43.584 to 57.260 total 13.676 km. on nh-216 (new nh -153) on epc mode in the state of chhattisgarh

Read more
Consultancy services of independent engineer for up-gradation of existing 6 lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of nh 47 (narol junction to sarkhej junction) in the state of gujarat (total length-

Consultancy services of independent engineer for up-gradation of existing 6 lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of nh 47 (narol junction to sarkhej junction) in the state of gujarat (total length-

Read more
Construction of 02 no rcc intake well of 15mtr diameter with approach bridge on either bank or river civil work onl and transmission main, wtp, scada, road crossings, forest clearance, vvnl for power line, land acquisitions, intake pumping machinery

Construction of 02 no rcc intake well of 15mtr diameter with approach bridge on either bank or river civil work onl and transmission main, wtp, scada, road crossings, forest clearance, vvnl for power line, land acquisitions, intake pumping machinery

Read more
Work for road safety to newly declared nh351g by reconstruction of minor bridge box culverts in place of damaged slab drain on kamlapur chotila road section btn km 172_0 to 173_0 and km 200_0 to 201_0 in the state of gujarat

Work for road safety to newly declared nh351g by reconstruction of minor bridge box culverts in place of damaged slab drain on kamlapur chotila road section btn km 172_0 to 173_0 and km 200_0 to 201_0 in the state of gujarat

Read more

Auction cum sale of 41 (forty one) nos standing trees required for removal for the purpose of the kuli-moregram road (sh-7) from 0.00 kmp to 36.45 km, widening and strengthening work (at birbhum district portion).

Read more
Chapra hridaypur road

Chapra hridaypur road proposed sadhinata sarak- widening and strengthening work from 0.00 kmp to 12.00 kmp under nadia division, pwd in the district of nadia.

Read more

Supervision consultancy services for burdwan arambag road (sh-7) from 6.50 kmp to 32.625 km-widening (from 7.00 m to 10.00 m cw) and strengthening work under burdwan division, p.w.d in the district of purba bardhaman

Read more
Construction of surface road with interlocking paving block of 80mm thickness from ch 4300m to ch 5000m and ch 5400m to ch 6200m from rohmoria tiniali towards rohmoria higher secondary school total length of road is 1500m including supply of all materials except cement

Construction of surface road with interlocking paving block of 80mm thickness from ch 4300m to ch 5000m and ch 5400m to ch 6200m from rohmoria tiniali towards rohmoria higher secondary school total length of road is 1500m including supply of all materials except cement

Read more

No attachments found

Get customized tender Recommendations for your Enterprise