Tender Details
Particulars | Details |
---|---|
Title |
Sitc Of 1 No. 8 Passenger Lift (G Plus 5 Floors ) At Telephone Bhavan, Kannur In Replacement Of Old One With 3 Years Annual Cmc
|
Description |
Sitc Of 1 No. 8 Passenger Lift (G Plus 5 Floors ) At Telephone Bhavan, Kannur In Replacement Of Old One With 3 Years Annual Cmc
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2025_BSNL_233344_1 |
Reference Number |
KRLCO-13/16(11)/20/2025-ELEC |
Tender Fee | 590 |
EMD | 46828 |
Tender Value | |
Place | Telephone Bhavan Kannur |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=263976 |
Start Date | April 22, 2025 23:30 |
End Date |
13/05/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Construction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreSurvey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Survey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Read moreConstruction of rcc hostel for boys a girls (50 plus 50) at diet, baksa (construction of rcc boys hostel g plus 1 with provision for extension upto g plus 3 level and construction of brick masonry boundary wall including heavy duty iron gates) under
Construction of rcc hostel for boys a girls (50 plus 50) at diet, baksa (construction of rcc boys hostel g plus 1 with provision for extension upto g plus 3 level and construction of brick masonry boundary wall including heavy duty iron gates) under
Read moreBoring and installing of 1 no new deep bore tubewell 12 inches x 8 inches (304.80mmx203.20mm) id with reverse rotary rig method for irrigation water in lieu of tubewell at part 10 village kaimbwala ut chandigarh
Boring and installing of 1 no new deep bore tubewell 12 inches x 8 inches (304.80mmx203.20mm) id with reverse rotary rig method for irrigation water in lieu of tubewell at part 10 village kaimbwala ut chandigarh
Read moreHiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Hiring of 1 no skilled wcl l1 services at ps 3 dispensary to carry out various misc jobs such as assistance in maintenance of records and assistance in other day to day office jobs for a period of four years from 01 07 2025 to 30 06 2029
Read moreEi work for the proposed g plus 4 building for directors, additional directors quarter guest house with g plus 5 storied foundation at the campus of wbja rajarhat sitc of 10 passenger lift and 16 pass stretcher cum passenger lift
Ei work for the proposed g plus 4 building for director s, additional directors quarter guest house with g plus 5 storied foundation at the campus of wbja rajarhat sitc of 10 passenger lift and 16 pas stretcher cum passenger lift
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of fire detection system.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of fire detection system.
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of ups.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of ups.
Read moreof your Industry type