Tender Details

Particulars Details
Title
Construction Of Rural Motor Road From Dhungatoli To Bandbagad Fair Site From Jauljibi Dharchula Motor Road Under Block Dharchula Of Assembly Constituency Dharchula Of District Pithoragarh. (Stage 1)
Description
Construction Of Rural Motor Road From Dhungatoli To Bandbagad Fair Site From Jauljibi Dharchula Motor Road Under Block Dharchula Of Assembly Constituency Dharchula Of District Pithoragarh. (Stage 1)
Organisation RES - Chief Engineer | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5900
EMD 3.06 Lakh
Tender Value
Place DHARCHULA
Link

AAAAAAAAAA

Login to view
Start Date May 06, 2025 23:30
End Date

21/05/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Wbphed/02/bwn of se/cc of 2025-2026 sl.no.4

Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&amp#x0d &amp#x0d &amp#x0d

Read more
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Read more
Construction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward

Construction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward

Read more
Upgradatrion of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay

Upgradation of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb22, length 2.700 km)&#x0d

Read more
Upgradation of rural road from sh connection (krishna biswas home) to ramkrishnapur dam

Upgradation of rural road from sh connection (krishan biswas home) to ramkrishnapur dam at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no. an01hb21, length 4.425 km)

Read more
Upgradation of rural road from sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay

Upgradation of rural road form sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb23, length 1.372 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise