Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of 1 No Panel (For Auxiliary Supply (440 V) 3 Phase Connection With Blower Assy.
|
Description |
Repairing Of 1 No Panel (For Auxiliary Supply (440 V) 3 Phase Connection With Blower Assy.

|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_330797_1 |
Reference Number |
BCCL/BII/EXC/REP/e-Tender/ 24-25 /174 Dt.28.02.25 |
Tender Fee | 0 |
EMD | 909 |
Tender Value | |
Place | ABOCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342878 |
Start Date | March 01, 2025 18:30 |
End Date |
10/03/2025 ( Expired 42 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreHiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreDesign, fabrication, supply, i & c of straightening machine with auxiliary systems as per annexure
Read more
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreInternal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Read moreSupply of water supply and repairing items for fy 2025-26 in nagar palika parishad, kareli
Supply of water supply and repairing items for fy 2025-26 in nagar palika parishad, kareli
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreof your Industry type