Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Horticulture Maintenance In Plant Area Part A
|
| Description |
Horticulture Maintenance In Plant Area Part A
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_94205_1 |
|
Reference Number |
9900294558 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | NTPC RIHAND |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97423 |
| Start Date | January 30, 2025 23:30 |
| End Date |
Expired
01/02/2025
Expired 601 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreHiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Hiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreOutsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreBt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type