Tender Details

Particulars Details
Title
Kmc/Dgc/Vii/058/038/25 26/D
Description
Maintenance Of Road At Dhapa Road (Disturbed Due To Sewer Line Construction ) Adjacent To Dog Pound In Wd 58
Organisation KOLKATA MUNICIPAL CORPORATION | State Govt. and UT
Tender Id 2025_KMC_865729_1
Reference
Number
KMC/DGC/VII/058/038/25-26/D
Tender Fee 0
EMD 14300
Tender Value -
Place ward no-58
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1945357

Start Date June 17, 2025 22:30
End Date
Expired 26/06/2025

Expired 477 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of pwd road from teela mode to banthla fly over damage due to laying trunk sewer in indraprasth scheme.

Restoration of pwd road from teela mode to banthla fly over damage due to laying trunk sewer in indraprasth scheme.

Read more
Laying of 200mm dia d.i. pipe line (k-7) from rajarani colony to hatiasuni on main road due to overlapping of drain and pipe line at current position in ward no. 58 under watco section, badagada, bbsr

Laying of 200mm dia d.i. pipe line (k-7) from rajarani colony to hatiasuni on main road due to overlapping of drain and pipe line at current position in ward no. 58 under watco section, badagada, bbsr

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Strengthening and maintenance of dog pound services by establishing facility management for multipurpose workers, in dog pound offices under deonar abattoir.

Strengthening and maintenance of dog pound services by establishing facility management for multipurpose workers, in dog pound offices under deonar abattoir.

Read more
Construction of dog pound on jind road mc gohana.

Construction of dog pound on jind road mc gohana.

Read more
Construction of dog pound on jind road mc gohana.

Construction of dog pound on jind road mc gohana.

Read more
Wd/25-26/3t-1/58

Repair research laboratory cum setting room no-205 at zoology department under kalyani university.

Read more
Renovation, boundary wall plantation of pound at mahavatpur billoch khasra no. 58 najibabad distt. bijnor

Renovation, boundary wall plantation of pound at mahavatpur billoch khasra no. 58 najibabad distt. bijnor

Read more
Ltg/58/wd-18/br-ii/z-i/24-25

Repairing works of bustee lighting&amp#x0d arrangement at nilmoni street bustee and&amp#x0d other bustees in wd no-18&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type