Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/Dgc/Vii/058/038/25 26/D
|
| Description |
Maintenance Of Road At Dhapa Road (Disturbed Due To Sewer Line Construction ) Adjacent To Dog Pound In Wd 58
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2025_KMC_865729_1 |
|
Reference Number |
KMC/DGC/VII/058/038/25-26/D |
| Tender Fee | 0 |
| EMD | 14300 |
| Tender Value | - |
| Place | ward no-58 |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1945357 |
| Start Date | June 17, 2025 22:30 |
| End Date |
Expired
26/06/2025
Expired 477 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of pwd road from teela mode to banthla fly over damage due to laying trunk sewer in indraprasth scheme.
Restoration of pwd road from teela mode to banthla fly over damage due to laying trunk sewer in indraprasth scheme.
Read moreLaying of 200mm dia d.i. pipe line (k-7) from rajarani colony to hatiasuni on main road due to overlapping of drain and pipe line at current position in ward no. 58 under watco section, badagada, bbsr
Laying of 200mm dia d.i. pipe line (k-7) from rajarani colony to hatiasuni on main road due to overlapping of drain and pipe line at current position in ward no. 58 under watco section, badagada, bbsr
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreStrengthening and maintenance of dog pound services by establishing facility management for multipurpose workers, in dog pound offices under deonar abattoir.
Strengthening and maintenance of dog pound services by establishing facility management for multipurpose workers, in dog pound offices under deonar abattoir.
Read moreConstruction of dog pound on jind road mc gohana.
Construction of dog pound on jind road mc gohana.
Read moreConstruction of dog pound on jind road mc gohana.
Construction of dog pound on jind road mc gohana.
Read moreWd/25-26/3t-1/58
Repair research laboratory cum setting room no-205 at zoology department under kalyani university.
Read moreRenovation, boundary wall plantation of pound at mahavatpur billoch khasra no. 58 najibabad distt. bijnor
Renovation, boundary wall plantation of pound at mahavatpur billoch khasra no. 58 najibabad distt. bijnor
Read moreLtg/58/wd-18/br-ii/z-i/24-25
Repairing works of bustee lighting&#x0d arrangement at nilmoni street bustee and&#x0d other bustees in wd no-18&#x0d
Read moreof your Industry type