Tender Details
Particulars | Details |
---|---|
Title |
Engagement Of User Fee Agency Through Eq At Mahanth Maniyari Fp At Km 535.100 Govindpur Fp At Km 602.200 For Operation Maintenance Of Two Laning Of Muzaffarpur Barauni Section Of Nh 28 From Km 519.600 To Km 627.000 In Bihar
|
Description |
Engagement Of User Fee Agency Through Eq At Mahanth Maniyari Fp At Km 535.100 Govindpur Fp At Km 602.200 For Operation Maintenance Of Two Laning Of Muzaffarpur Barauni Section Of Nh 28 From Km 519.600 To Km 627.000 In Bihar
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_213160_1 |
Reference Number |
NHAI/13013/547/CO/24-25/EQ /Mahanth Maniyari Govindpur FP |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=234929 |
Start Date | October 30, 2024 23:30 |
End Date |
05/11/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read more4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreof your Industry type