| Particulars | Details |
|---|---|
| Title |
Sr To Conservation Of Dilapidated Portion Of Pitching Wall Along With Shiv Road Phase Ii At Jaisalmer Fort Distt. Jaisalmer Rajasthan
|
| Description |
Sr To Conservation Of Dilapidated Portion Of Pitching Wall Along With Shiv Road Phase Ii At Jaisalmer Fort Distt. Jaisalmer Rajasthan
|
| Organisation | Archaeological Survey of India | Central Govt. Ministry/Department |
| Tender Id | 2024_ASI_830285_1 |
|
Reference Number |
21/2024-25 Pitching wall Jaisalmer Fort, Distt. Jaisalmer |
| Tender Fee | 5000 |
| EMD | 2.06 Lakh |
| Tender Value | - |
| Place | Jaisalmer Fort Distt. Jaisalmer Rajasthan |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872484 |
| Start Date | October 10, 2024 23:30 |
| End Date |
Expired
04/11/2024
Expired 709 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreSr to conservation of dilapidated portion of pitching wall from bastion no. 14 phase i at jaisalmer fort distt jaisalmer
Sr to conservation of dilapidated portion of pitching wall from bastion no. 14 phase i at jaisalmer fort distt jaisalmer
Read moreConservation restoration of collapsed upper fortification wall including adjoining dilapidated wall near bastion no 15 at fort jaisalmer distt jaisalmer rajasthan
Conservation restoration of collapsed upper fortification wall including adjoining dilapidated wall near bastion no 15 at fort jaisalmer distt jaisalmer rajasthan
Read moreConstruction of various watershed development structures in project area of jaisalmer block jaisalmer (mjsa 2.0 (phase ii)
Construction of&#x0d various&#x0d watershed&#x0d development&#x0d structures in&#x0d project area of&#x0d jaisalmer block&#x0d jaisalmer&#x0d (mjsa 2.0&#x0d (phase ii)
Read moreConstruction of various watershed development structures in project area of jaisalmer block jaisalmer (mjsa 2.0 (phase ii)
Construction of&#x0d various&#x0d watershed&#x0d development&#x0d structures in&#x0d project area of&#x0d jaisalmer block&#x0d jaisalmer&#x0d (mjsa 2.0&#x0d (phase ii)
Read moreMw(sr) repairs and strengthening works to kingsway steps and portion of fort wall beside kingsway steps ingolconda fort, hyderabad
Erection of tubular access scaffolding with platforms, reconstruction of adjacent fort wall, pointing to surfaces etc as per rfp document and directions of asi officials
Read moreKarikkodu devaswom in thrikkariyoor group- reconstructing the dilapidated protection wall along the stream on north portion
Karikkodu devaswom in thrikkariyoor group- reconstructing the dilapidated protection wall along the stream on north portion
Read moreBoulder revetment and pitching work along the bank of chaulkhowa river at no.2 ghorathal village under ridf-xxxi during 2025-26
Boulder revetment and pitching work along the bank of chaulkhowa river at no.2 ghorathal village under ridf-xxxi during 2025-26
Read moreConstruction of various water harvesting structures under mjsa 2.0 phase-i in block-fatehgarh dist jaisalmer
Construction of various water harvesting structures under mjsa 2.0 phase-i in block-fatehgarh dist jaisalmer
Read moreMw(sr) repairs and strengthening works to the masonry walls which are in dilapidated conditio beside excavation area and besides dressing hall and dome portion of ladies body guard area in golconda fort
Removal of debris with boulders, leveling the undulated ground etc as per rfp and directions of asi officials