Tender Details

Particulars Details
Title
Construction Of Pcc Hard Standing Top And Manger For Cast And Boarded Out Animals In Gcrc
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/5592825
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date November 10, 2024 17:13
End Date
Expired 02/12/2024

Expired 684 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Similar Tenders
Provn of hard standing/ hard surface/ pcc flooring at various locations at afs under ge (af) jorhat

Provn of hard standing/ hard surface/ pcc flooring at various locations at afs under ge (af) jorhat

Read more
Repairs to approach path, steps, chequered tiles, paver block, pcc hard standing etc at ge dssc wellington

Repairs to approach path, steps, chequered tiles, paver block, pcc hard standing etc at ge dssc wellington

Read more
Repair/ replacement of pathway, railing, hard standing, pcc drain and other misc works at sanjauli under ge (i) jutogh

Repair/ replacement of pathway, railing, hard standing, pcc drain and other misc works at sanjauli under ge (i) jutogh

Read more
Provision of covered shed to stp instalation at cgdhq-15 okha, provision of loading unloading plinth near layoff store bldg no p-146 and provision of pcc hard standing near bldg no p-03 at icgs okha under ge (i) cg porbadar

Provision of covered shed to stp instalation at cgdhq-15 okha, provision of loading unloading plinth near layoff store bldg no p-146 and provision of pcc hard standing near bldg no p-03 at icgs okha under ge (i) cg porbadar

Read more
86231 special repairs to road at south campus afmc in front of project qtr no. 01 and 05, bldg no. 178, 179, ccm black top surface, dhanvantari auditorium hard standing and allied work in the aor of afmc under ge (central) pune.

86231 special repairs to road at south campus afmc in front of project qtr no. 01 and 05, bldg no. 178, 179, ccm black top surface, dhanvantari auditorium hard standing and allied work in the aor of afmc under ge (central) pune.

Read more
Metal storage cabinet,almirah med steel with shelves,bath mat pvc all as n on drawings,bed hard map all as n on drawings,bin linen multipurpose as n on drawings,chair computer revolving med back with fixed loop,chair dining as n on drawings,chair dining cushioned map as n on drawings,chair easy as n on drawings,chair school with hand board,chair verandah all as n on drawings,chair writing as n on drawings,chair writing map all as n on drawings,charpoy with hard top map all as n on drawings,desk with seat double,desk with seat single,hat stand with mirror,ladder aluminium,locker bedside steel,rack shoe steel 700x300x880mm,receptical pvc,side board,sofa 5 seater,stool dressing cushioned,stool steel type i,table 900 x 600 x 760mm wooden,table 900 x 600 x 760mm with drawer steel,table 900 x 600 x 760mm with out drawer steel,table steel 900x900x760mm without drawer,table bed side map,table bed side steel type ii,table center two tier all as n on drawing,table compute

Metal storage cabinet,almirah med steel with shelves,bath mat pvc all as n on drawings,bed hard map all as n on drawings,bin linen multipurpose as n on drawings,chair computer revolving med back with fixed loop,chair dining as n on drawings,chair dining cushioned map as n on drawings,chair easy as n on drawings,chair school with hand board,chair verandah all as n on drawings,chair writing as n on drawings,chair writing map all as n on drawings,charpoy with hard top map all as n on drawings,desk with seat double,desk with seat single,hat stand with mirror,ladder aluminium,locker bedside steel,rack shoe steel 700x300x880mm,receptical pvc,side board,sofa 5 seater,stool dressing cushioned,stool steel type i,table 900 x 600 x 760mm wooden,table 900 x 600 x 760mm with drawer steel,table 900 x 600 x 760mm with out drawer steel,table steel 900x900x760mm without drawer,table bed side map,table bed side steel type ii,table center two tier all as n on drawing,table compute

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise