Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pcc Hard Standing Top And Manger For Cast And Boarded Out Animals In Gcrc
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5592825 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 10, 2024 17:13 |
| End Date |
Expired
02/12/2024
Expired 684 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Provn of hard standing/ hard surface/ pcc flooring at various locations at afs under ge (af) jorhat
Provn of hard standing/ hard surface/ pcc flooring at various locations at afs under ge (af) jorhat
Read moreRepairs to approach path, steps, chequered tiles, paver block, pcc hard standing etc at ge dssc wellington
Repairs to approach path, steps, chequered tiles, paver block, pcc hard standing etc at ge dssc wellington
Read moreRepair/ replacement of pathway, railing, hard standing, pcc drain and other misc works at sanjauli under ge (i) jutogh
Repair/ replacement of pathway, railing, hard standing, pcc drain and other misc works at sanjauli under ge (i) jutogh
Read moreProvision of covered shed to stp instalation at cgdhq-15 okha, provision of loading unloading plinth near layoff store bldg no p-146 and provision of pcc hard standing near bldg no p-03 at icgs okha under ge (i) cg porbadar
Provision of covered shed to stp instalation at cgdhq-15 okha, provision of loading unloading plinth near layoff store bldg no p-146 and provision of pcc hard standing near bldg no p-03 at icgs okha under ge (i) cg porbadar
Read more86231 special repairs to road at south campus afmc in front of project qtr no. 01 and 05, bldg no. 178, 179, ccm black top surface, dhanvantari auditorium hard standing and allied work in the aor of afmc under ge (central) pune.
86231 special repairs to road at south campus afmc in front of project qtr no. 01 and 05, bldg no. 178, 179, ccm black top surface, dhanvantari auditorium hard standing and allied work in the aor of afmc under ge (central) pune.
Read moreMetal storage cabinet,almirah med steel with shelves,bath mat pvc all as n on drawings,bed hard map all as n on drawings,bin linen multipurpose as n on drawings,chair computer revolving med back with fixed loop,chair dining as n on drawings,chair dining cushioned map as n on drawings,chair easy as n on drawings,chair school with hand board,chair verandah all as n on drawings,chair writing as n on drawings,chair writing map all as n on drawings,charpoy with hard top map all as n on drawings,desk with seat double,desk with seat single,hat stand with mirror,ladder aluminium,locker bedside steel,rack shoe steel 700x300x880mm,receptical pvc,side board,sofa 5 seater,stool dressing cushioned,stool steel type i,table 900 x 600 x 760mm wooden,table 900 x 600 x 760mm with drawer steel,table 900 x 600 x 760mm with out drawer steel,table steel 900x900x760mm without drawer,table bed side map,table bed side steel type ii,table center two tier all as n on drawing,table compute
Metal storage cabinet,almirah med steel with shelves,bath mat pvc all as n on drawings,bed hard map all as n on drawings,bin linen multipurpose as n on drawings,chair computer revolving med back with fixed loop,chair dining as n on drawings,chair dining cushioned map as n on drawings,chair easy as n on drawings,chair school with hand board,chair verandah all as n on drawings,chair writing as n on drawings,chair writing map all as n on drawings,charpoy with hard top map all as n on drawings,desk with seat double,desk with seat single,hat stand with mirror,ladder aluminium,locker bedside steel,rack shoe steel 700x300x880mm,receptical pvc,side board,sofa 5 seater,stool dressing cushioned,stool steel type i,table 900 x 600 x 760mm wooden,table 900 x 600 x 760mm with drawer steel,table 900 x 600 x 760mm with out drawer steel,table steel 900x900x760mm without drawer,table bed side map,table bed side steel type ii,table center two tier all as n on drawing,table compute
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type