Tender Details
Particulars | Details |
---|---|
Title |
Installation Of 1 No. New Clustered (3) Sprinkler Irrigation System (Solar) At Damlogoria Wht At Churulia Mouza, Jamuria Block, Paschim Burdwan.
|
Description |
Installation Of 1 No. New Clustered (3) Sprinkler Irrigation System (Solar) At Damlogoria Wht At Churulia Mouza, Jamuria Block, Paschim Burdwan.
|
Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
Tender Id | 2025_WRDD_832176_1 |
Reference Number |
07/RIDF/WRIDD/BWNIP OF 2024 -25 |
Tender Fee | 0 |
EMD | 22720 |
Tender Value | |
Place | Damlogoria WHT at Churulia Mouza, Jamuria Block, P |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1854084 |
Start Date | April 05, 2025 14:30 |
End Date |
22/04/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read moreProviding tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1
Providing tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Read moreCa no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Ca no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Read moreMaintenance of firefighting system at g4 storied office building and kolkata eeti alongwith pumps and motors at vidyut bhavan, la block township, data center complex and kolkata eeti complex, new town
Maintenance of firefighting system at g4 storied office building and kolkata eeti alongwith pumps and motors at vidyut bhavan, la block township, data center complex and kolkata eeti complex, new town
Read moreCa no. ge af no.1/gur-13/2025-26 repair replacement and maintenance of unserviceable point wiring, flameproof lights fitting/fixtures, earthing infrastructure and allied work for lightening protection system at 54 asp at af stn gurgaon under ge (af)
Ca no. ge af no.1/gur-13/2025-26 repair replacement and maintenance of unserviceable point wiring, flameproof lights fitting/fixtures, earthing infrastructure and allied work for lightening protection system at 54 asp at af stn gurgaon under ge (af)
Read moreProvn of 3 phase isolation transformer and installation of new automatic weather station along with allied works at af stn awantipur
Provn of 3 phase isolation transformer and installation of new automatic weather station along with allied works at af stn awantipur
Read moreSpecial repair of bldg no-1/c (temp) of pt store at the sikh li regt centre and provn of drainage system at officers mess of the sikh li regt centre fatehgarh cantt
Special repair of bldg no-1/c (temp) of pt store at the sikh li regt centre and provn of drainage system at officers mess of the sikh li regt centre fatehgarh cantt
Read moreCa no. ge af no.1/gur-07/2025-26 repair to steel furniture including painting to steel furniture in block nos p/144 to p/153 in sekhon vihar area repair of furniture should be carried out in above block omq on priority basis yard alsoat af stn palam
Ca no. ge af no.1/gur-07/2025-26 repair to steel furniture including painting to steel furniture in block nos p/144 to p/153 in sekhon vihar area repair of furniture should be carried out in above block omq on priority basis yard also at afstn palam
Read moreof your Industry type