Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tn 5363 Post Operational Chemical Cleaning Of Boiler Unit 1 And 2 (110 Mw) Stage I, Ktps, Kota
|
| Description |
Post Operational Chemical Cleaning Of Boiler Unit 1 And 2 (110 Mw) Stage I, Ktps, Kota
|
| Organisation | RRVUN - CMD | State Govt. and UT |
| Tender Id | 2024_RRVUN_441127_1 |
|
Reference Number |
TN-5363 |
| Tender Fee | 2680 |
| EMD | 1.53 Lakh |
| Tender Value | - |
| Place | Kota Super Thermal Power Station |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=792133 |
| Start Date | January 10, 2025 17:30 |
| End Date |
Expired
21/01/2025
Expired 631 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tn-26 earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.
Earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.
Read moreTn-15314 supply of hot end and hot intermediate end baskets embedded with heating elements for air pre heater unit 3 and 4 at kstps, kota. (2x210 mw) units.
Supply of hot end and hot intermediate end baskets embedded with heating elements for air pre heater unit 3 and 4 at kstps, kota. (2x210 mw) units.
Read moreConstruction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.
Construction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.
Read moreTn-5385 post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota
Post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota
Read moreTn-5180 work of post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota
Work of post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota
Read moreSingle stage post operational chemical cleaning of 500 mw once through
Single stage post operational chemical cleaning of 500 mw once throughunit 1 boiler water circuit during overhauling at ntpc tstps kaniha
Read moreCustom bid for services - two stage post operational boiler chemical cleaning of boiler unit no 1 a
Read more
Custom bid for services - 200134977 single stage post operational chemical cleaning of one 490 mw
Read more
of your Industry type