Tender Details

Particulars Details
Title
Tn 5363 Post Operational Chemical Cleaning Of Boiler Unit 1 And 2 (110 Mw) Stage I, Ktps, Kota
Description
Post Operational Chemical Cleaning Of Boiler Unit 1 And 2 (110 Mw) Stage I, Ktps, Kota
Organisation RRVUN - CMD | State Govt. and UT
Tender Id 2024_RRVUN_441127_1
Reference
Number
TN-5363
Tender Fee 2680
EMD 1.53 Lakh
Tender Value -
Place Kota Super Thermal Power Station
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=792133

Start Date January 10, 2025 17:30
End Date
Expired 21/01/2025

Expired 631 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tn-26 earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.

Earthing system adequacy study for 220 kv switchyard and other major electrical equipment at ktps, kota.

Read more
Tn-15314 supply of hot end and hot intermediate end baskets embedded with heating elements for air pre heater unit 3 and 4 at kstps, kota. (2x210 mw) units.

Supply of hot end and hot intermediate end baskets embedded with heating elements for air pre heater unit 3 and 4 at kstps, kota. (2x210 mw) units.

Read more
Construction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.

Construction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.

Read more
Tn-5385 post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota

Post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota

Read more
Tn-5180 work of post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota

Work of post operational chemical cleaning of boiler unit 3 or 4 (210 mw) stage-ii, ktps, kota

Read more
Single stage post operational chemical cleaning of 500 mw once through

Single stage post operational chemical cleaning of 500 mw once throughunit 1 boiler water circuit during overhauling at ntpc tstps kaniha

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise