Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Jungle Clearing Work In Factory Area Heep.
|
| Description |
Jungle Clearing Work In Factory Area Heep.
|
| Organisation | Bharat Heavy Electricals Limited (BHEL) |
| Tender Id | 2023_BHEL_28889_1 |
|
Reference Number |
BHEL/HEEP/WEX-WCS/202301691, Dt. 22.09.23 |
| Tender Fee | 0 |
| EMD | 5088 |
| Tender Value | - |
| Place | WCS Office |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in |
| Start Date | September 22, 2023 22:30 |
| End Date |
Expired
06/10/2023
Expired 1082 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Emergent repairs to damaged lining at isolated patches, jungle clearance, cutting and removal of bushes,levelling of inspection path on distributary d 19 and its minors of kakatiya main canal in nizamabad district
Emergent repairs to damaged lining at isolated patches, jungle clearance, cutting and removal of bushes,levelling of inspection path on distributary d 19 and its minors of kakatiya main canal in nizamabad district
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreBalance work to multipurpose community hall at kandiguda in ward no.14, kapra of kapra circle-7, mmc(rs.40.00 lakhs)
Balance work to multipurpose community hall at kandiguda in ward no.14, kapra of kapra circle-7, mmc(rs.40.00 lakhs)
Read moreConstruction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreBt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Read moreUpgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreMisc. jungle/wild growth clearing in various area in heep.
Misc. jungle/wild growth clearing in various area in heep.
Read moreMisc. jungle/wild growth clearing in various area in heep
Misc. jungle/wild growth clearing in various area in heep
Read moreof your Industry type