Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
T 03/Ahd/Dtps/Oh7/2024 2025
|
| Description |
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant During Overhauling Of Unit7, 2 X500 Mw, Dtps, Anpara
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2024_RVUNL_926835_1 |
|
Reference Number |
T-03/AHD/DTPS/OH7/2024-2025 |
| Tender Fee | 590 |
| EMD | 5000 |
| Tender Value | - |
| Place | ANPARA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1600578 |
| Start Date | June 08, 2024 14:30 |
| End Date |
Expired
02/07/2024
Expired 839 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreProcurement of excen crusher assembly and its spares and different spares for bottom ash hopper for unit 5 oh under ahp mm
Procurement of excen crusher assembly and its spares and different spares for bottom ash hopper for unit 5 oh under ahp mm
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210mw atps anpara insulation refractory and removal of fly ash debris from pressure part ducts hoppers and roof of penthouse etc during overhauling of unit-02 3x210 m..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210mw atps anpara insulation refractory and removal of fly ash debris from pressure part ducts hoppers and roof of penthouse etc during overhauling of unit-02 3x210 m..
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreTggenco btps stage ii- cam division-reconditioning of clinker grinder rollers, roller shafts, shaft sleeves, shaft sleeve housings, fabrication of wear and guide plates, lantern rings of unit-4 bottom ash hopper clinker grinder assemblies during the overhaul for the year 2026-27
Tggenco btps stage ii- cam division-reconditioning of clinker grinder rollers, roller shafts, shaft sleeves, shaft sleeve housings, fabrication of wear and guide plates, lantern rings of unit-4 bottom ash hopper clinker grinder assemblies during the overhaul for the year 2026-27
Read moreFixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 6, 2x500mw, dtps, anpara
Fixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 6, 2x500mw, dtps, anpara
Read moreFixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant
Fixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 7, 2x500mw, dtps, anpara
Read moreFixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant
Fixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 7, 2x500mw, dtps, anpara
Read moreof your Industry type