Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Of Wtp Of Ph I Stg I 205 Mld, Ph I Stg Ii 205 Mld, Ph Ii 410 Mld And Ph Iii 410 Mld Of Krishna Drinking Water Supply Project At Kodandapur For A Period Of 2 Years Under Sd I, Td Iii, Sahebnagar.
|
| Description |
Annual Maintenance Of Water Treatment Plants Of Phase I Stage I 205 Mld, Phase I Stage Ii 205 Mld, Phase Ii 410 Mld And Phase Iii 410 Mld Of Krishna Drinking Water Supply Project At Kodandapur For A Period Of 2 Years Under Sd I, Transmission Division Iii, Sahebnagar
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 612385 |
|
Reference Number |
eTender Notice No. 61/CGM(E)/TC/T3/AMC-SD-I/TD-III/2025-26, Date:08/07/2025. |
| Tender Fee | 5954 |
| EMD | 1.68 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | July 09, 2025 23:00 |
| End Date |
Expired
16/07/2025
Expired 455 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc filter back wash waste water channel in place of existing damaged brick masonry channel in 410 mld wtp of kdwsp phase-ii at kodandapur under sd-i, td-iii, sahebnagar
Construction of rcc filter back wash waste water channel in place of existing damaged brick masonry channel in 410 mld water treatment plant of kdwsp phase-ii at kodandapur under sd-i, transmission division iii, sahebnagar
Read moreSupply, delivery of filter media of all grades and removing the old media including reapirs and overhauling of lateral pipes of hdpe and ac perferoated pipes, epoxy painting to the internal surfaces the filter beds and laying of new media of different grades in the twin rapid gravity filter beds of filter nos 11 to 20 in 205 mld wtp of stage-ii of ph-i at kodandapur under sd-i, td-iii,sahebnagar
Supply, delivery of filter media of all grades and removing the old media including repairs and overhauling of ateral pipes of hdpe and ac perforated pipes, epoxy painting to the internal surfaces the filter beds and laying of new media of different grades in the twin rapid gravity filter nos 11 to 20 in 205 mld wtp of stage-ii of phase-i at kodandapur under sd-i, td-iii sahebnagar
Read moreConstruction of crs compound wall over the existing damaged compound wall at 1230 mld wtps at kodandapur and clear water reservoirs and pumping stations at nasarlapally under sd-i, td-iii, sahebnagar (reservation earmarked for schedule castes (as per g.o.ms.no.59, dt:21.05.2018
Construction of new crs compound wall over the existing damaged compound wall at 1230 mld wtps of kodandapur and clear water reservoirs and pumping stations at narsarlapally under sd-i, transmission division iii, sahebnagar. (reservation earmarked for schedule castes) (as per g.o.ms.no.59, dt: 21.05.2018)
Read moreAnnual maintenance of 2200/2375mm dia ms pumping main 76kms and gravity main of 38 kms from kodandapur to sahebnagar 9ml and 9ml clear water reservoirs of ph-i 18 ml clear water reservoirs of ph-ii and ph-iii in the premises at kpur, npally and gkondla and 6 nos of 22.50 ml master balancing reservoirs of kdwsp ph-i, ii and iii in the premises of gungal, sd-i, td-iii, sahebnagar for the period of (02) two years
Annual maintenance of 2200/2375 mm dia ms pumping main 76kms and gravity main of 38 kms from kodandapur to sahebnagar, 9ml and 9ml clear water reservoirs of phase-i, 18ml clear water reservoirs of phase-ii and phase-iii in the premises at kodandapur , nasarlapally and godakondla and 6 nos of 22.50ml master balancing reservoirs of kdwsp phase-i,ii and iii in the premises at gungal,sd-i, td-iii, sahebngar for the period of (two) 02 years
Read moreAnnual maintenance of 2200mm dia/2375mm dia ms pumping main 76kms and gravity main of 36kms kodandapur to sahebnagar 9ml and 9ml clear water reservoirs of ph-i 18ml clear water reservoirs of phase-ii and phase-iii in the premises at kpur, npally and gkondla and 6 nos of 22.50 ml mbr of kdwso ph-i,ii iii in the premises at gungal under sd.i, td-iii, sahebnagar for a period of two years
Annual maintenance of 2200/2375 mm dia ms pumping main 76kms and gravity main of 38 kms from kodandapur to sahebnagar, 9ml and 9ml clear water reservoirs of phase-i, 18ml clear water reservoirs of phase-ii and phase-iii in the premises at kodandapur , nasarlapally and godakondla and 6 nos of 22.50ml master balancing reservoirs of kdwsp phase-i,ii and iii in the premises at gungal,sd-i, td-iii, sahebngar for the period of (two) 02 years
Read moreAnnual maintenance contract for estimates (02 nos) under sd-iii of td-iii, sahebnagar for the perod of two years
Annual maintenance contract for estimates (02 nos) under sub division no.iii of td-iii, sahebnagar for the period of (two) 02 years
Read moreManning, operation and maintenance of ph-iv 150 mld wtp and jackwells, for the period of (1) one year under singoor section, sd-ii, peddapur, td-ii, patancheru
Manning, operation and maintenance of ph-iv 150 mld water treatment plant and jackwells, for the period of (1) one year under singoor section,sd-ii, peddapur, transmission division no.ii, patancheru
Read moreArresting water supply leakage and replacing the damaged 300mm dia ms air tee, 200mm dia sluice valves air valves existing on ms 200mm dia pumping main of kdwsp phase-i from kodandapur to nasarlapally under sd-iof td-iii, sahebnagar.
Arresting water supply leakage and replacing the damaged 300mm dia ms air tee, 200mm dia sluice valves air valves existing on ms 200mm dia pumping main of kdwsp phase-i from kodandapur to nasarlapally under sd-i of transmission. div.iii, sahebnagar
Read moreAmc (i) 150 mld wtp of ph-ii kalabgoor filter beds section for the period of 2 years under kalabgoor wtp section, sd-i (ii) 75 mld wtp of ph-i, rajampet filter beds section for the period of 2 years under rajampet wtp section, sd-i (iii) air valves, sluice valves, 3.00 mg reservoirs, chlorine plant, electrical installations and other works at singapur campus of ph-iii and iv mwss under singapur section, sd-iii, o and m division viii, patancheru
Annual maintenance (i) 150 mld wtp of ph-ii kalabgoor filter beds section for the period of (2) years under kalabgoor wtp section, sd-i (ii) 75 mld wtp of ph.i, rajampet filter beds section for the period of (2) years under rajampet wtp section, sd-i (iii) air valves, sluice valves, 3.00 mg reservoirs, chlorine plant, electrical installations and other works at singapur campus of phase-iii and iv mwss under singapur section, sd-iii, o and m division no.viii, patancheru
Read moreRefurbishment of existing 2000amps 6.6kv, vcb panels including supply, delivery,erection, testing and commissioning of 6.6kv ht vcb panels at ph-i of 132/6.6kv sub-statios bearing housing and vcbs for 1425kw, 1475kw and 1300kw pump sets at kodandapur, nasarlapally and godakondla under eam section, electrical sub division,td-iii, sahebnagar
Refurbishment of existing 2000 amps 6.6 kv, vcb panel including supply, delivery, erection, testing and commissioning of 6.6kv ht vcb panels at phase-i of 132 6.6kv substations, bearing housing and vcbs for 1425kw, 1475 kw and 1300 kw pump sets at kodandapur, nasarlapally and godakondla under eam section electrical sub division, transmission division no.iii, sahebnagar.
Read moreof your Industry type