Tender Details
Particulars | Details |
---|---|
Title |
Amc (I) 150 Mld Wtp Of Ph Ii Kalabgoor Filter Beds Section For The Period Of 2 Years Under Kalabgoor Wtp Section, Sd I (Ii) 75 Mld Wtp Of Ph I, Rajampet Filter Beds Section For The Period Of 2 Years Under Rajampet Wtp Section, Sd I (Iii) Air Valves, Sluice Valves, 3.00 Mg Reservoirs, Chlorine Plant, Electrical Installations And Other Works At Singapur Campus Of Ph Iii And Iv Mwss Under Singapur Section, Sd Iii, O And M Division Viii, Patancheru
|
Description |
Annual Maintenance (I) 150 Mld Wtp Of Ph Ii Kalabgoor Filter Beds Section For The Period Of (2) Years Under Kalabgoor Wtp Section, Sd I (Ii) 75 Mld Wtp Of Ph.I, Rajampet Filter Beds Section For The Period Of (2) Years Under Rajampet Wtp Section, Sd I (Iii) Air Valves, Sluice Valves, 3.00 Mg Reservoirs, Chlorine Plant, Electrical Installations And Other Works At Singapur Campus Of Phase Iii And Iv Mwss Under Singapur Section, Sd Iii, O And M Division No.Viii, Patancheru
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 548307 |
Reference Number |
EP.No. 50 /CGM(E)/TC/T1/AMC/WTP/OM Dn-VIII/2024-25, Date: 28/09/2024 |
Tender Fee | 11800 |
EMD | 3.9 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | September 30, 2024 20:00 |
End Date |
07/10/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, delivery and laying of filter sand media,grit and pebbles including removing of old media grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media , grit and pebbles with replacement of damaged top/bottom and side ms channels with new ms channels, replacement of lateral ac/cpvc etc., for filter beds nos. 1,2,3,4,5 and 9 plastering and water proofing to roof top of wtp building at ph-i, wtp rajampet,sd-i, td-ii
Supply, delivery and laying of filter sand media, grit and pebbles including removing of old media grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media, grit and pebbles with replacement of damaged top/bottom and side ms channels with new ms channels, replacement of lateral ac/cpvc etc., for filter beds nos 1,2,3,4,5 and 9 plastering and water proofing to roof top of wtp building at phase-i, wtp rajampet under sub-division no.i, kalabgoor, transmission division no.ii, patancheru
Read moreRefurbishment and upgradation of existing old system including supply, delivery, erection, testing and commissioning of 3.3kv 503.0 kw, ht motors and mandatory spares for 3.3kv hsc pump sets at rajampet patancheru 6.6kv hsc pumpsets at phase-ii, iii and iv at kalabgoor, peddapur campus and 6.6kv vertical pump sets at intake well, kalabgoor under td-ii, patancheru
Refurbishment and up-gradation of existing old system including supply,delivery,erection,testing and commissioning of 3.3 kv 503.0 kw, ht motors and mandatory spares for 3.3 kv hsc pump sets at rajampet patancheru, 6.6 kv hsc pump sets at phase-ii,iii and iv of kalabgoor,peddapur campus and 6.6kv vertical pump sets at intake well, kalabgoor etc., under manjira drinking water supply scheme of transmission division no.ii, patancheru
Read moreRefurbishment and upgradation of existing old system including supply, delivery, erection, testing and commissioning of 3.3kv hsc pump sets, soft ers, connected cables, valves along with accessories etc at rajampet and patancheru ph-i under mdwss td-ii, patancheru
Refurbishment and up-gradation of existing old system including supply,delivery,erection,testing and commissioning of 3.3 kv hsc pump sets, soft ers, connected cables, valves along with accessories etc, at rajampet and patancheru of phase-i under manjira drinking water supply scheme, transmission division no.ii, patancheru
Read moreShifting of 200/150mm dia double kinetic air valves existing on 1500mm dia ms gravity main of kdwsp phase-iii ring main-ii and 800mm dia psc/ms of pocharam pipeline for facilitating development road widening work at nfc circle by ghmc under moula-ali section, sd-iii, td-iii, sahebnagar
Shifting of 200/150mm dia double kinetic air valves existing on 1500mm dia ms gravity main of kdwsp phase-iii ring main-ii and 800mm dia psc/ms of pocharam pipe line for facilitating development road widening work at nfc circle by ghmc under moula-ali section, sd-iii, trans.div.iii, sahebnagar.
Read moreGodavari drinking water supply scheme phase-ii iii - filling of osmansagar himayatsagar reservoirs with godavari water for rejuvenation of musi river
Ncb for gdwss ph ii and iii filling of os and hs reservoirs with godavari water for rejuvenation of musi river-manufacture, supply, lowering, laying, jointing, testing and commissioning of 2200mm ms pmain from ghanpur to osmansagar, 2400mm ms pmain from ghanpur to muthangi, 3000mm dia ms pipeline from kokapet to osmansagar conduit along orr and 2200mm dia ms pipeline for interconnection of osmansagar and himayathsagar reservoirs, 3000mm dia ms pmain from wtp to mbr at ghanpur, construction of 80 ml mbr, 18ml rwr and ph and eme, transfr, substn at ghanpur and 1500mm dia ms main, construction of 120 mld wtp, 18ml cwr, ph with eme, substn, 1200mm dia ms cwpmain at osmansagar, 22.50ml mbr at golden mile and 800/600/400mm dia distn mains from mbr under os and 1200mm dia ms main, construction of 70 mld wtp, 18ml cwr, ph with eme, substn at hs, 1000mm dia ms pmain to budvel reservoir under hs reservoir under hybrid annuity mode of contract-including mom of project for 10 years package ii
Read moreGodavari drinking water supply scheme phase-ii iii - filling of osmansagar himayatsagar reservoirs with godavari water for rejuvenation of musi river
National competitive bidding ncb for godavari drinking water supply project phase-ii and phase-iii and filling of osmansagar and himayathsagar reservoirs for rejuvenation of musi river under hybrid annuity mode of contract manufacture, supply, lowering, laying, jointing, testing and commissioning of 3000mm dia ms pumping main in two rows 10 tmc each from mallannasagar to ghanpur, construction of pump house, electro mechanical equipment, transformers, substation at mallannasagar and construction of 1170 mld capacity wtp, 40 ml clear water reservoir cum pump house, electro mechanical equipment, transformers, at ghanpur under hybrid annuity mode of contract including manning, operation and maintenance of project for 10 years package-i
Read moreManufacture, supply, delivery,erection, testing and commissioning of 800mm dia bf valve on the 1000mm pipeline running from bojagutta to asifnagar filter beds to draw the krishna water to asifnagar balancing tank under osmansagar section, sd-ii, td-i, himayathsagar
Manufacture, supply, delivery, erection, testing and commissioning of 800mm dia bf valve on the 1000mm pipeline running from bojagutta to asifnagar filter beds to draw the krishna water to asifnagar balancing tank under osmansagar section, sd-ii, transmission division i, himayathsagar.
Read moreConstruction of central chlorination cell room in the premises of asifnagar filter beds section, under af beds section, sd-ii, td-i, himayathsagar
Construction of central chlorination cell room in the premises of asifnagar filter beds section, under af beds section, sd-ii, transmission division i, himayathsagar
Read moreManning, operation and maintenance of ph-iv 150 mld wtp and jackwells, for the period of (1) one year under singoor section, sd-ii, peddapur, td-ii, patancheru
Manning, operation and maintenance of ph-iv 150 mld water treatment plant and jackwells, for the period of (1) one year under singoor section,sd-ii, peddapur, transmission division no.ii, patancheru
Read more1.cleaning of jungle at wrs colony for a period of two years. 2.cleaning of jungle at bmy colony, zone-i, ii, iii, p.p. yard colony and bmy yard for a period of two year.
For complete deion and other details, please refer to tender
Read moreof your Industry type