| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Of (I) 150 Mld Wtp Of Ph Ii Kalabgoor Filter Beds Section For The Period Of 2 Years
|
| Description |
Annual Maintenance (I) 150 Mld Wtp Of Ph Ii Kalabgoor Filter Beds Section For The Period Of (2) Years Under Kalabgoor Wtp Section, Sd I (Ii) 75 Mld Wtp Of Ph.I, Rajampet Filter Beds Section For The Period Of (2) Years Under Rajampet Wtp Section,Sd I (Iii) Air Valves, Sluice Valves, 3.00 Mg Reservoirs, Chlorine Plant, Electrical Installations And Other Works At Singapur Campus Of Phase Iii And Iv Mwss Under Singapur Section, Sd Iii, Om Division No.Viii, Patancheru
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 531017 |
|
Reference Number |
eTender Notice No. 39/CGM(E)/TC/T1/AMC/WTP/OM Dn-VIII/2024-25, Date: 24/07/2024 |
| Tender Fee | 11800 |
| EMD | 3.9 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | July 25, 2024 18:30 |
| End Date |
Expired
01/08/2024
Expired 763 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Read moreAmc (i) 150 mld wtp of ph-ii kalabgoor filter beds section for the period of 2 years under kalabgoor wtp section, sd-i (ii) 75 mld wtp of ph-i, rajampet filter beds section for the period of 2 years under rajampet wtp section, sd-i (iii) air valves, sluice valves, 3.00 mg reservoirs, chlorine plant, electrical installations and other works at singapur campus of ph-iii and iv mwss under singapur section, sd-iii, o and m division viii, patancheru
Annual maintenance (i) 150 mld wtp of ph-ii kalabgoor filter beds section for the period of (2) years under kalabgoor wtp section, sd-i (ii) 75 mld wtp of ph.i, rajampet filter beds section for the period of (2) years under rajampet wtp section, sd-i (iii) air valves, sluice valves, 3.00 mg reservoirs, chlorine plant, electrical installations and other works at singapur campus of phase-iii and iv mwss under singapur section, sd-iii, o and m division no.viii, patancheru
Read moreManufacturing, supply,delivery and erection of lt main panel board capacity 400 amps at chemical house and supply, delivery, repair,rewiring and reconditioning of control panel for 30 hp compressor at chemical house compressor room in wtp ph-ii at kalabgoor, wtp ph-ii filter kalabgoor section under sd-i, kalabgoor, td-ii, patancheru
Manufacturing, supply, delivery and erection of lt main panel board capacity 400 amps at chemical house and supply, delivery, repair, rewiring and reconditioning of control panel for 30 hp compressor at chemical house compressor room in wtp ph-ii at kalabgoor, wtp ph-ii filter kalabgoor section under sd-i, kalabgoor, transmission division ii, patancheru.
Read moreManning, operation and maintenance of ph-iv 150 mld wtp and jackwells, for the period of (1) one year under singoor section, sd-ii, peddapur, td-ii, patancheru
Manning, operation and maintenance of ph-iv 150 mld water treatment plant and jackwells, for the period of (1) one year under singoor section,sd-ii, peddapur, transmission division no.ii, patancheru
Read moreAnnual maintenance of wtp of ph-i stg-i 205 mld, ph-i stg-ii 205 mld, ph-ii 410 mld and ph-iii 410 mld of krishna drinking water supply project at kodandapur for a period of 2 years under sd-i, td-iii, sahebnagar.
Annual maintenance of water treatment plants of phase-i stage-i 205 mld, phase-i stage-ii 205 mld, phase-ii 410 mld and phase-iii 410 mld of krishna drinking water supply project at kodandapur for a period of 2 years under sd-i, transmission division-iii, sahebnagar
Read moreMaintenance of filter beds at ktk oc iii ug section bhupalpalli for a period of two years
Maintenance of filter beds at ktk oc iii ug section bhupalpalli for a period of two years
Read moreMaintenance of filter beds at ktk oc iii ug section bhupalpalli for a period of two years
Maintenance of filter beds at ktk oc-iii (ug section), bhupalpalli for a period of two years.
Read moreSupply, delivery and laying of filter sand media, grit and pebbles including removing of old media, grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media , grit and pebbles for filter beds nos. 1,2,9 and 10, at ph-ii, wtp kalabgoor,sd-i, kalabgoor,td-ii, patancheru
Supply, delivery and laying of filter sand media, grit and pebbles including removing of old media, grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media, grit and pebbles for filter bed nos.1,2,9 and 10 at phase-ii wtp kalabgoor under sub division no.i, kalabgoor, transmission division no.ii, patancheru
Read moreSupply, delivery and laying of filter sand media, grit and pebbles including removing of old media, grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media , grit and pebbles for filter beds nos. 11,12,13 and 14, at ph-ii, wtp kalabgoor,sd-i, kalabgoor,td-ii, patancheru
Supply, delivery and laying of filter sand media, grit and pebbles including removing of old media, grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media, grit and pebbles for filter bed nos.11,12,13 and 14 at phase-ii wtp kalabgoor under sub division no.i, kalabgoor, transmission division no.ii, patancheru
Read moreAnnual maintenance of asif nagar and shaikpet filter beds for the period of two years under asif nagar filter beds section, sd-ii, td-i, himayathsagar
Annual maintenance of asif nagar and shaikpet filter beds for the period of two years under asif nagar filter beds section, sub division-ii, transmission division no.i, himayathsagar
Read moreof your Industry type