Tender Details
Particulars | Details |
---|---|
Title |
Manning, Operation And Maintenance Of Ph Iv 150 Mld Wtp And Jackwells, For The Period Of (1) One Year Under Singoor Section, Sd Ii, Peddapur, Td Ii, Patancheru
|
Description |
Manning, Operation And Maintenance Of Ph Iv 150 Mld Water Treatment Plant And Jackwells, For The Period Of (1) One Year Under Singoor Section,Sd Ii, Peddapur, Transmission Division No.Ii, Patancheru
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 578958 |
Reference Number |
eTender Notice No:EP. 97 /CGM(E)/TC/T1/TD-II/MoM-Ph-IV/2024-25, dated: 01-03-2025. |
Tender Fee | 7069 |
EMD | 2 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | March 03, 2025 17:00 |
End Date |
06/03/2025 ( Expired 92 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreCanal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass
Canal water based water supply project for construction of 5.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mallanwala khass
Read moreCanal water based water supply project for construction of 3.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mudki
Canal water based water supply project for construction of 3.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at mudki
Read moreCanal water based water supply project for construction of 4.3 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at talwandi bhai
Canal water based water supply project for construction of 4.3 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at talwandi bhai
Read moreof your Industry type