Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fiber Optic Direct Hot Spot Temperature Monitoring System For Power Transformer As Per Annexure Enc
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2025/B/6084635 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 25, 2025 15:20 |
| End Date |
Expired
04/04/2025
Expired 429 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Materials rate per unit for mgnrega programme under ranaghat-ii dev. block, nokari, nadia. as n in annexure-i
Materials rate per unit for mgnrega programme under ranaghat-ii dev. block, nokari, nadia. as n in annexure-i
Read moreDrug eluting stents cetegory of goods pacemakers, ptmc balloon and other consumable items etc. for the use in cath lab. (as per annexure -5)
Drug eluting stents cetegory of goods pacemakers, ptmc balloon and other consumable items etc. for the use in cath lab. (as per annexure -5)
Read moreConsultancy services for identification/selection of site and preparation of pre-feasibility report (pfr) for setting up of pump storage project at rana pratap sagar hydroelectric power station locations, rawatbhata, chittorgarh as per scope of work.
Consultancy services for identification/selection of site and preparation of pre-feasibility report (pfr) for setting up of pump storage project at rana pratap sagar hydroelectric power station locations, rawatbhata, chittorgarh as per scope of work.
Read moreTechnical estimate for providing power supply to 3 ph lt no. pww connection having requested with erection of 25 kva , 3 ph dt as per the request from the applicant in bhadgaon taluka
Technical estimate for providing power supply to 3 ph lt no. pww connection having requested with erection of 25 kva , 3 ph dt as per the request from the applicant in bhadgaon taluka
Read moreFiber optic direct hot-spot temperature monitoring system for power transformer as per annexure enc
Read more
Fiber optic direct hot spot temperature measurement system
Fiber optic direct hot spot temperature measurement system as per enquiry item description
Read moreof your Industry type