Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Of Wire Mesh Crate And Cc Work For Protection Of Tower No 305 Of 400 K V Rishikesh Nehtaur Line In Kotwali River Near Chidyapur District Haridwar
|
Description |
Providing And Laying Of Wire Mesh Crate And Cc Work For Protection Of Tower No 305 Of 400 K V Rishikesh Nehtaur Line In Kotwali River Near Chidyapur District Haridwar
|
Organisation | MD (Power Transmisison Corporation of Uttarakhand Limited) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 1.75 Lakh |
Tender Value | |
Place | Rishikesh |
Link |
AAAAAAAAAA Login to view |
Start Date | April 28, 2025 19:40 |
End Date |
26/05/2025 ( 27 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening of safety system of power cables in trench and associated work with digital linear heat detection cable system lhdc in 400 kv switch yard at 400 kv substation rishikesh
Strengthening of safety system of power cables in trench and associated work with digital linear heat detection cable system lhdc in 400 kv switch yard at 400 kv substation rishikesh
Read moreProviding and laying of cement concrete approach road and cement concrete paver blocks in front of control room building at 400 kv substation, rishikesh
Providing and laying of cement concrete approach road and cement concrete paver blocks in front of control room building at 400 kv substation, rishikesh
Read moreProviding and laying of wire mesh crate and cc work for protection of tower no 305 of 400 kv rishikesh-nehtaur line in kotwali river near chidyapur district haridwar
Providing and laying of wire mesh crate and cc work for protection of tower no 305 of 400 kv rishikesh-nehtaur line in kotwali river near chidyapur district haridwar
Read moreLaying of pupe line for water supply and execution of other works in different location ward 37 (umrao sahab ki dargaah ashok school well gali etc. 15th finance file no. 158/25x9/1
Laying of pupe line for water supply and execution of other works in different location ward 37 (umrao sahab ki dargaah ashok school well gali etc. 15th finance file no. 158/25x9/1
Read moreWbphed/ee/md/niet_11 of 2025-2026, sl. no. 14
Laying of parallel/ dedicated pipeline and providing common manifold and providing balance fhtc for better functionality at magura zone-ii piped water supply scheme at ratua-ii block of malda district under malda division, phe dte, govt. of west beng
Read moreZone no. 03, ward no.10, 11, 12, 13, 14, 15, 16, 22, 23, 24 and 25, providing and laying of hume pipe and construction of wbm road (piece work) in different places.
Zone no. 03, ward no.10, 11, 12, 13, 14, 15, 16, 22, 23, 24 and 25, providing and laying of hume pipe and construction of wbm road (piece work) in different places.
Read moreWbphed/ee/md/niet_06 of 2025-2026, sl.no.10
Additional laying of pipe line for improvement of fhtc functionality by upvc pipe and providing functional household tap connection (fhtc) for kanthalanpur piped water supply scheme at habibpur dev.block in the district of malda under malda division
Read moreWbphed/ee/md/niet_03 of 2025-2026, sl. no. 02
Laying of dedicated /parallel pipe line for better functionality and providing balance fhtc with supply of sluice valve and sluice valve chamber for parameshwarpur piped water supply scheme at bamangola dev. block in the district malda under malda di
Read moreWbpwd/pw(r)/se/shc/nit no 04 of 2025-2026(sl-01)
Sankrail manikpur hirapur bazar road, from 0.00 km to 3.00 kmp, strengthening work and from 3.00 kmp to 6.30 km, surfacing work and 0.00km to 3.00 km. restoration work of phe cutting for laying pipe line under howrah highway division in the district
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreof your Industry type