Tender Details
| Particulars | Details |
|---|---|
| Title |
04/2025 26/Ee T/Tvm
|
| Description |
Reconstruction Of Collapsed Compound Wall With Rcc Or Rr Retaining Wall Cum Compound Wall Along The Boundary Of Gpra Land (From Old Sub Division Office To Cwc Land) At Nettayam Phase 1 (Balance Work)
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 109957 |
|
Reference Number |
04/2025-26/EE-T/TVM |
| Tender Fee | 0 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243130393935372430342f323032352d32362f45452d542f54564d |
| Start Date | April 23, 2025 22:53 |
| End Date |
Expired
30/04/2025
Expired 539 days ago |
Bidding on tenders like this?
Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreReconstruction of collapsed retaining cum compound wall te building compound denduluru eluru ba
Reconstruction of collapsed retaining cum compound wall te building compound denduluru eluru ba
Read moreReconstruction of collapsed compound wall work
Reconstruction of collapsed compound wall work
Read moreReconstruction of damaged and collapsed compound wall
Reconstruction of damaged and collapsed compound wall at misrigunj reservoir premises under doodbowli section, sub division-ii of operations and maintenance division-i (reserved for waddera / sagara communities only as per g.o.ms.no.59, icad (reforms) department dated:21.05.2018)
Read moreSpecial repair work for reconstruction of collapsed compound
Special repair work for reconstruction of collapsed compound
 wall during rain construction of storm water drainage with rain water
 harvesting in esi hospital, hosur.
Read moreReconstruction of collapsed compound wall at fsd sujangarh
Reconstruction of collapsed
 compound wall at fsd
 sujangarh
Read moreReconstruction of collapsed retaining wall at range office munnar, and completion of balance work for retaining wall at range officers quarters
Reconstruction of collapsed retaining&#x0d wall at range office munnar and completion of&#x0d balance work for retaining wall at range officers&#x0d quarters at munnar
Read moreReconstruction of collapsed compound wall at ttd telephone exchange compound eluru
Reconstruction of collapsed compound wall at ttd telephone exchange compound eluru
Read moreThis tender has closed
Leave your details and we'll alert you to new tenders like it.
Free tender checklists for your industry →