Tender Details
Particulars | Details |
---|---|
Title |
Renovation And Repair Works At Haldia Sub Divisional Court Compound Under Tamluk Division, Pwd District Of Purba Medinipur In The Year 2024 2025.
|
Description |
Renovation And Repair Works At Haldia Sub Divisional Court Compound Under Tamluk Division, Pwd District Of Purba Medinipur In The Year 2024 2025.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_WBPWD_729383_1 |
Reference Number |
WBPWD/NIT-13/EE/TAMLUK DIVN/2024-2025 |
Tender Fee | 0 |
EMD | 24534 |
Tender Value | |
Place | Haldia Construction Sub Division No.-I |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1609004 |
Start Date | August 07, 2024 15:30 |
End Date |
27/08/2024 ( Expired 267 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Read moreAAAAAAAAAA
Login to viewSupply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.
Read moreAAAAAAAAAA
Login to viewSupply, delivery and installation of submersible pump motor sets at expected flood affected river bed sites tubewells with supply of necessary substitutes at different water supply scheme under neturia block under pmd, phe dte. in the district of pur
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreDevelopment of msrtc establishments along with commercial facilities on plot of land owned by the maharashtra state road transport corporation(msrtc) at sangli bs, sangli madhavnagar bs and depot, sangli division office in sangli district through ppp
Development of msrtc establishments along with commercial facilities on plot of land owned by the maharashtra state road transport corporation(msrtc) at sangli bs, sangli madhavnagar bs and depot, sangli division office in sangli district through ppp
Read moreQuality improvement of drinking water supply by way of construction of 08 nos. of 2500 gph capacity package type irp under the jurisdiction of dws sub-division, kamalpur under dhalai tripura district, tripura during the year 2024-25
Quality improvement of drinking water supply by way of construction of 08 nos. of 2500 gph capacity package type irp under the jurisdiction of dws sub-division, kamalpur under dhalai tripura district, tripura during the year 2024-25
Read moreQuality improvement of drinking water supply by way of construction of 06 nos. of 2500/10000 gph capacity package type irp under the jurisdiction of dws sub-division, kamalpur under dhalai tripura district, tripura during the year 2024-25
Quality improvement of drinking water supply by way of construction of 06 nos. of 2500/10000 gph capacity package type irp under the jurisdiction of dws sub-division, kamalpur under dhalai tripura district, tripura during the year 2024-25
Read moreAAAAAAAAAA
Login to viewBalance pipeline laying, road repair with allied works under proposed ground water based asuti i asuti ii and chatta gp pwss to accommodate fhtc in thakurpukur-maheshtala block under swd - i, p.h.e. dte district south 24 parganas.
Read moreQuality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Quality improvement of drinking water supply by way of construction of 8 nos. 5000 gph capacity package type iron removal plant (irp) and 03 nos. pump house at different places under the jurisdiction of dws sub-division, salema.
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreof your Industry type