Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection And Strengthening Of Overhead Line, Damaged Pole, Conductor Etc. At Around Plant And Colony Of Sawang Washery As And When Damaged From Storm, Rain And Other Reasons.
|
| Description |
Erection And Strengthening Of Overhead Line, Damaged Pole, Conductor Etc. At Around Plant And Colony Of Sawang Washery As And When Damaged From Storm, Rain And Other Reasons.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_338450_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/25-26/24 Date 26.06.2025 |
| Tender Fee | 0 |
| EMD | 4400 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350839 |
| Start Date | June 27, 2025 16:30 |
| End Date |
Expired
07/07/2025
Expired 467 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing rectification of damage of lt ht overhead line dismantling shifting and erection of conductor of overhead line in different places in adarsh nagar colony after comes heavy storm under ta eandm kusmunda area
Repairing rectification of damage of lt ht overhead line dismantling shifting and erection of conductor of overhead line in different places in adarsh nagar colony after comes heavy storm under ta eandm kusmunda area
Read more34/2026-2027/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (running tender) under the jurisdiction of edd-milak, rampur
34/2026-2027/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (running tender) under the jurisdiction of edd-milak, rampur
Read more33/2026-27/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (running tender) under the jurisdiction of edd -swar, rampur
33/2026-27/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (running tender) under the jurisdiction of edd -swar, rampur
Read more35/2026-2027/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (running tender) under the jurisdiction of edd-bilaspur, rampur
35/2026-2027/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (running tender) under the jurisdiction of edd-bilaspur, rampur
Read moreErection and strengthening of overhead line, damaged pole, conductor etc. at around plant and colony of sawang washery as and when damaged from storm, rain and other reasons.
Erection and strengthening of overhead line, damaged pole, conductor etc. at around plant and colony of sawang washery as and when damaged from storm, rain and other reasons.
Read moreProviding and fixing lightening arrestor at 11kv and 3.3kv overhead conductor at inside and outside of plant at sawang washery.
Providing and fixing lightening arrestor at 11kv and 3.3kv overhead conductor at inside and outside of plant at sawang washery.
Read moreRemoval of spillage slime / slurry of thickener and around at sawang washery.
Removal of spillage slime / slurry of thickener and around at sawang washery.
Read moreRemoval / cleaning of mud / extraneous materials around the laboratory and secondary crusher at sawang washery.
Removal / cleaning of mud / extraneous materials around the laboratory and secondary crusher at sawang washery.
Read moreCutting and cleaning of jungle, bushes and tree branches at around overhead power supply line as well as at around electrical equipments of sawang washery as destination free during monsoon period.
Cutting and cleaning of jungle, bushes and tree branches at around overhead power supply line as well as at around electrical equipments of sawang washery as destination free during monsoon period.
Read moreRemoval of accumulated spillage coal of different section and drain cleaning around the plant at sawang washery.
Removal of accumulated spillage coal of different section and drain cleaning around the plant at sawang washery.
Read moreof your Industry type