Tender Details

Particulars Details
Title
Service Part W.R.T Installation Of Platform With Hand Railing Along The Pipe Rack Of Asdl From Stage Ii Pump House Under Ahp Mm, Bktpp Under Capex 2025 26
Description
Service Part W.R.T Installation Of Platform With Hand Railing Along The Pipe Rack Of Asdl From Stage Ii Pump House Under Ahp Mm, Bktpp Under Capex 2025 26
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2025_WBPDC_852875_1
Reference
Number
WBPDCL/BKTPP/NIT/E3760/25-26
Tender Fee 0
EMD 34354
Tender Value
Place Bakreswar Thermal Power Project
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1907373

Start Date June 14, 2025 16:30
End Date
Expired 28/06/2025

Expired 370 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.

Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.

Read more
Procurement of 500 meter 300 nbx9.52 mm thick ms pipe for replacement of asdl under ahp-mm, bktpp

Procurement of 500 meter 300 nbx9.52 mm thick ms pipe for replacement of asdl under ahp-mm, bktpp

Read more
Service part for renovation of ash slurry disposal pipe line by drc pipes and bends below culvert in residential area (sangrampur village etc.) outside plant under ahp-mm, bktpp under capex 2025-26

Service part for renovation of ash slurry disposal pipe line by drc pipes and bends below culvert in residential area (sangrampur village etc.) outside plant under ahp-mm, bktpp under capex 2025-26

Read more
Restoration of ash slurry disposal lines -asdl from dp4 to dp5 at new ash pond area with supply of structural steel material under ahp-mm, bktpp

Restoration of ash slurry disposal lines -asdl from dp4 to dp5 at new ash pond area with supply of structural steel material under ahp-mm, bktpp

Read more
Procurement of hdpe pipe and other material for bktpp under capex 2025 26

Procurement of hdpe pipe and other material for bktpp under capex 2025 26

Read more
Procurement of different sizes of c i pipe for ahp-mm, stage ii through approved capex 2023 24 sgtpp

Procurement of different sizes of c i pipe for ahp-mm, stage ii through approved capex 2023 24 sgtpp

Read more
Service contract for overhauling of silo-2 under ahp-mm, stage-ii at sgtpp.

Service contract for&amp#x0d overhauling of silo-2&amp#x0d under ahp-mm, stage-ii at sgtpp.

Read more
Procurement of pump with motor and other accessories for ash water recovery system under ahp-mm dept., ktps through capex 25-26.

Procurement of pump with motor and other accessories for ash water recovery system under ahp-mm dept., ktps through capex 25-26.

Read more
Service contract for ht motor overhauling of ahp em stage ii during u 3 overhauling 2025 under ahp em at sgtpp, wbpdcl

Service contract for ht motor overhauling of ahp em stage ii during u 3 overhauling 2025 under ahp em at sgtpp, wbpdcl

Read more
Construction of 125 x 115 mm dia x 70 m depth drilled tube well with installation of im-ii hand pump, lowering 32 mm gi pipe with platform and drain at 24 nos. of different anganbadi centres of district - ramgarh for the year 2025-26

Construction of 125 x 115 mm dia x 70 m depth drilled tube well with installation of im-ii hand pump, lowering 32 mm gi pipe with platform and drain at 24 nos. of different anganbadi centres of district - ramgarh for the year 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise