Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Tit Bit Repairing And Painting Of Unit 1 Cooling Tower Outside Including Inside Cell Doors And Hand Railing And Top Hand Railing And Doors Etc During Overhauling Period At Bk Tpp
|
Description |
Tit Bit Repairing And Painting Of Unit 1 Cooling Tower Outside Including Inside Cell Doors And Hand Railing And Top Hand Railing And Doors Etc During Overhauling Period At Bk Tpp
|
Organisation | Government of West Bengal |
Tender Id | 2023_WBPDC_543026_1 |
Reference Number |
WBPDCL/BKTPP/NIT/E2635/23-24 |
Tender Fee | 0 |
EMD | 26913 |
Tender Value | |
Place | BKTPP |
Link | https://wbtenders.gov.in |
Start Date | July 08, 2023 14:30 |
End Date |
27/07/2023 ( Expired 690 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtc. of different types of quarter at durgapur w.r quarter complex sh. repairs of plasters, repairs of w.c, repairs of doors and ,m.s. grill, flooring, colouring, painting etc complete during the year 2025 26
Mtc. of different types of quarter at durgapur w.r quarter complex sh. repairs of plasters, repairs of w.c, repairs of doors and ,m.s. grill, flooring, colouring, painting etc complete during the year 2025 26
Read moreRepairing and painting works at the record room of proposed finance audit cell along with arrangement of steel rack at block-g,1st floor within writers buildings compound during the year 2025-2026
Repairing and painting works at the record room of proposed finance audit cell along with arrangement of steel rack at block-g,1st floor within writers buildings compound during the year 2025-2026
Read moreRepairs to 16 mgd filtration plant no-ii railing, replacement of doors and windows and painting etc. at head water works in circle-1 area.
Repairs to 16 mgd filtration plant no-ii railing, replacement of doors and windows and painting etc. at head water works in circle-1 area.
Read moreRepairing and painting works, change of damaged flooring by vinyle floor including s and p fittings at toilet at the chamber of additional secretary, i and ca deptt, top floor of block-d within writers buildings compound during the year 2025-26.
Repairing and painting works, change of damaged flooring by vinyle floor including s and p fittings at toilet at the chamber of additional secretary, i and ca deptt, top floor of block-d within writers buildings compound during the year 2025-26.
Read moreAssisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Read moreCleaning the trough of uact 1 and painting with ac black paint during the overhaul period of unit 1
Cleaning the trough&#x0d of uact 1 and painting with ac black paint during the overhaul period of unit 1
Read moreWbkp/cp/nit-236/internal repairing and painting work at qtr. no. f-1 of body guard lines /ten, dated.05.06.2025
Internal repairing and painting work at qtr. no. f-1 of body guard lines at 7, d.h. road, kolkata, during the year 2025-2026.
Read moreRepairing and painting of 2 nos stair case inside including parapet guard wall etc of big studio at srfti kolkata
Repairing and painting of 2 nos stair case inside including parapet guard wall etc of big studio at srfti kolkata
Read moreEngagement of pump for dewatering, de-sludging at cooling tower-1 during overhauling of unit-1, 2025 at sgtpp, wbpdcl
Engagement of pump for dewatering, de-sludging at cooling tower-1 during overhauling of unit-1, 2025 at sgtpp, wbpdcl.
Read moreCondition assessment of critical rcc structures of u-1, stage-i(2x800mw) at ntpc gadarwara during unit overhauling/shutdown period
Condition assessment of critical rcc structures of u-1, stage-i(2x800mw) at ntpc gadarwara during unit overhauling/shutdown period
Read moreof your Industry type