Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Two Ventilation Stoppings With Door In E 9 Bg And E 8 Tg Between 5th And 6th Dip In Xvi (B) Seam At Moonidih Colliery W.J Area
|
Description |
Construction Of Two Ventilation Stoppings With Door In E 9 Bg And E 8 Tg Between 5th And 6th Dip In Xvi (B) Seam At Moonidih Colliery W.J Area
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_325512_1 |
Reference Number |
BCCL/WJA/MND/SUR/2024-25/58 |
Tender Fee | 0 |
EMD | 2706 |
Tender Value | |
Place | Moonidih Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337418 |
Start Date | January 11, 2025 19:30 |
End Date |
21/01/2025 ( Expired 140 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways in jamuna 9/10 mine.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways in jamuna 9/10 mine.
Read moreConstruction of 50 nos. ventilation stoppings by ccsb for smooth ventilation of iii seam and vb2 seam at vishnupuri underground mine no. ii of pench area
Construction of 50 nos. ventilation stoppings by ccsb for smooth ventilation of iii seam and vb2 seam at vishnupuri underground mine no. ii of pench area
Read moreConstruction of cc drains with cover slabs from malla sadha shivarao house (d.no-3-6-48a) to devarala vijaya kumar house (d.no-3-9-33/1), gollapudi subbarao house (d.no-3-9-29/5) to mogili ramarao house (d.no-3-6-51/4) and patan subhani house (d.no-3-10-16) to nagineni ratna kumari house (d.no-3-9-18/1) at hari prasad nagar area in ward no-28 in chirala municipality
Construction of cc drains with cover slabs from malla sadha shivarao house (d.no-3-6-48a) to devarala vijaya kumar house (d.no-3-9-33/1), gollapudi subbarao house (d.no-3-9-29/5) to mogili ramarao house (d.no-3-6-51/4) and patan subhani house (d.no-3-10-16) to nagineni ratna kumari house (d.no-3-9-18/1) at hari prasad nagar area in ward no-28 in chirala municipality
Read moreConstruction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area
Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area
Read moreTransportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area
Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area
Read moreCleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area
Cleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area
Read moreConstruction of epi stopping in 7th rise between tg of e-8 and bg of e-9 panel in xvi(b) seam 500mh at moonidih colliery w.j area .
Construction of epi stopping in 7th rise between tg of e-8 and bg of e-9 panel in xvi(b) seam 500mh at moonidih colliery w.j area .
Read moreCleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area
Cleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area
Read moreConstruction of permanent support by constructing side support wall and brick pillar in between 8d-7d/31l-30l in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of permanent support by constructing side support wall and brick pillar in between 8d-7d/31l-30l in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreof your Industry type