Tender Details

Particulars Details
Title
Construction Of Two Ventilation Stoppings With Door In E 9 Bg And E 8 Tg Between 5th And 6th Dip In Xvi (B) Seam At Moonidih Colliery W.J Area
Description
Construction Of Two Ventilation Stoppings With Door In E 9 Bg And E 8 Tg Between 5th And 6th Dip In Xvi (B) Seam At Moonidih Colliery W.J Area&#X0d
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_325512_1
Reference
Number
BCCL/WJA/MND/SUR/2024-25/58
Tender Fee 0
EMD 2706
Tender Value
Place Moonidih Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337418
Start Date January 11, 2025 19:30
End Date

21/01/2025 ( Expired 140 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Read more
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways in jamuna 9/10 mine.

Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways in jamuna 9/10 mine.

Read more
Construction of 50 nos. ventilation stoppings by ccsb for smooth ventilation of iii seam and vb2 seam at vishnupuri underground mine no. ii of pench area

Construction of 50 nos. ventilation stoppings by ccsb for smooth ventilation of iii seam and vb2 seam at vishnupuri underground mine no. ii of pench area

Read more
Construction of cc drains with cover slabs from malla sadha shivarao house (d.no-3-6-48a) to devarala vijaya kumar house (d.no-3-9-33/1), gollapudi subbarao house (d.no-3-9-29/5) to mogili ramarao house (d.no-3-6-51/4) and patan subhani house (d.no-3-10-16) to nagineni ratna kumari house (d.no-3-9-18/1) at hari prasad nagar area in ward no-28 in chirala municipality

Construction of cc drains with cover slabs from malla sadha shivarao house (d.no-3-6-48a) to devarala vijaya kumar house (d.no-3-9-33/1), gollapudi subbarao house (d.no-3-9-29/5) to mogili ramarao house (d.no-3-6-51/4) and patan subhani house (d.no-3-10-16) to nagineni ratna kumari house (d.no-3-9-18/1) at hari prasad nagar area in ward no-28 in chirala municipality

Read more
Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area

Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area

Read more
Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area

Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area&#x0d

Read more
Cleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area

Cleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area&#x0d

Read more
Construction of epi stopping in 7th rise between tg of e-8 and bg of e-9 panel in xvi(b) seam 500mh at moonidih colliery w.j area .

Construction of epi stopping in 7th rise between tg of e-8 and bg of e-9 panel in xvi(b) seam 500mh at moonidih colliery w.j area .

Read more
Cleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area

Cleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area

Read more
Construction of permanent support by constructing side support wall and brick pillar in between 8d-7d/31l-30l in kenda (r-vi) seam of bansra colliery under kunustoria area

Construction of permanent support by constructing side support wall and brick pillar in between 8d-7d/31l-30l in kenda (r-vi) seam of bansra colliery under kunustoria area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise