Tender Details

Particulars Details
Title
Construction Of One Stoppings (1mt Thick) In 6th Rise Between Tg Of E 7 Panel And Bg Of E 8 Panel In Xvi(b) Seam 500 Mh At Moonidih Colliery W.J Area
Description
Construction Of One Stoppings (1mt Thick) In 6th Rise Between Tg Of E 7 Panel And Bg Of E 8 Panel In &#X0d Xvi(b) Seam 500 Mh At Moonidih Colliery W.J Area
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_333014_1
Reference
Number
BCCL/WJA/MND/SUR/2024-25/99
Tender Fee 0
EMD 9212
Tender Value
Place Moonidih Colliery ,WJ Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345203
Start Date March 20, 2025 19:30
End Date

25/03/2025 ( Expired 52 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Proposal for construction of 20 nos. r.c.c. sectionalization 20 nos rcc isolation stoppings in panel b28 b29 b30 b31 b3 b4 b5 b37 b36 in seam vib at khairaha u g mine

Proposal for construction of 20 nos. r.c.c. sectionalization 20 nos rcc isolation stoppings in panel b28 b29 b30 b31 b3 b4 b5 b37 b36 in seam vib at khairaha u g mine

Read more
13 nos. of newly construction and also repairing of old ventilation stoppings in kalimati seam at khoodia colliery.

13 nos. of newly construction and also repairing of old ventilation stoppings in kalimati seam at khoodia colliery.

Read more
Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Read more
Construction of 14 nos. sectionalisation stopping to sectionalize the area from 29l-42l/5ed-13ed in narsamuda (r-x) seam working at narsamuda colliery under dhemomain group,sdpa

Construction of 14 nos. sectionalisation stopping to sectionalize the area from 29l-42l/5ed-13ed in narsamuda (r-x) seam working at narsamuda colliery under dhemomain group,sdpa

Read more
Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine

Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine

Read more
Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.

Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.

Read more
Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area

Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area

Read more
Construction of 68 nos. of ventilation stoppings with acc blocks at 0lw, -5lw, 68d/2lw, 2lw/68d and 7lw/68d district of seam iv(m), and -4lw/59r districts of seam iv(b) at saoner mine no. 3, of saoner sub area of nagpur area

Construction of 68 nos. of ventilation stoppings with acc blocks at 0lw, -5lw, 68d/2lw, 2lw/68d and 7lw/68d district of seam iv(m), and -4lw/59r districts of seam iv(b) at saoner mine no. 3, of saoner sub area of nagpur area

Read more
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.

Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.

Read more
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.

Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise