Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp 2026 27 Renovation Of Field Channel Starting From Kavilpad Branch Tail End Left Diversion From Ch 0/300km To Ch 0/530km General Civil Work
|
| Description |
Clearing Jungle,Demolishing Concrete,Pcc 1 4 8, Cc 1 3 6, Cc 1 2 4,Plastering.Earth Filling
|
| Organisation | Irrigation Department | CE,P1,KZKD | SE,Siruvani Project Circle,Palakkad | EE,Irr.Div.MLPZA |
| Tender Id | 2026_Irrig_875830_1 |
|
Reference Number |
IRR/PI/TR/602/2026_5_1_1/1 |
| Tender Fee | 2760 |
| EMD | 29641 |
| Tender Value | 11.86 Lakh |
| Place | Kerala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=Home&service=page |
| Start Date | October 03, 2026 16:30 |
| End Date |
Expired
13/10/2026
Expired 3 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Left out portion of nh-27 at polaikalan ch. 0/2500
Left out portion of nh-27 at polaikalan ch. 0/2500
Read moreGeneral nip action plan 2026 27 desilting from ch 0 m to tail end of vellayani east branch channel general civil work 1
General nip action plan 2026 27 desilting from ch 0 m to tail end of vellayani east branch channel general civil work 1
Read moreRepairs and strengthening of slab drains at ch 1 570 3 055 4 560 cr escape at ch 0 912 2 735 12 735 nala syphon at ch 7 396 and reconstruction of vrb at ch 13 710 of surya left bank canal
Repairs and strengthening of slab drains at ch 1 570 3 055 4 560 cr escape at ch 0 912 2 735 12 735 nala syphon at ch 7 396 and reconstruction of vrb at ch 13 710 of surya left bank canal
Read moreGeneral-mp-es-annual maintenance 2026- 27-silt removal jungle clearance for chulannur branch canal between ch 0/000 km to 6/400 km and its sub canals-general civil work
Engaging man mazdoor ,engaging hydraulic excavator for canal cleaning
Read moreGeneral kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work
General kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work
Read moreGps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Gps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Read moreLens tail light glass,solution valcanising tube 01 tube of 75,bolt,bulb parking 40 mp 12v 5w,o ring spark plug,plate clutch housing upper,screw adjusting,boot lever no1,holder bulb,fuse assy main,switch assy backup lamp,switch heater fan,pipe brake no 8,wheel nut,wheel nut,shim 080mm thick,adjusting plug 7.7mm long,gasket muffler,assy pipe line for suction upper,bracket wiper motor,starting rope with nylon knob,lock nut,fuel hose,oil seal,oil seal,bulb d 12 3 21 6 ts 29 201,brake hose,starter push button,terminal,gasket connection,starter push button,assy fuel line rubber hose to fuel pum,double ended tubular box spanner 17x19 i,feed pump
Lens tail light glass,solution valcanising tube 01 tube of 75,bolt,bulb parking 40 mp 12v 5w,o ring spark plug,plate clutch housing upper,screw adjusting,boot lever no1,holder bulb,fuse assy main,switch assy backup lamp,switch heater fan,pipe brake no 8,wheel nut,wheel nut,shim 080mm thick,adjusting plug 7.7mm long,gasket muffler,assy pipe line for suction upper,bracket wiper motor,starting rope with nylon knob,lock nut,fuel hose,oil seal,oil seal,bulb d 12 3 21 6 ts 29 201,brake hose,starter push button,terminal,gasket connection,starter push button,assy fuel line rubber hose to fuel pum,double ended tubular box spanner 17x19 i,feed pump
Read more133/2023-24-kunnummal parakkandy road tarring ch.0/300km to ch.0/400km
Annual plan-vengad gp 133/2023-24-kunnummal parakkandy road tarring ch.0/300km to ch.0/400km-general civil work
Read moreGeneral cpp mlbc cada 2023-24 modernisation of field channels at ch.0/400km (left side),at ch.0/500km (left side), at ch.0/700km(left side), at ch.1/100km (right side)and atch.1/500km (left and right side),at ch.6/100km(right side) and atch.9/300km (
Modernisation of field channels at ch.0/400km (left side),at ch.0/500km (left side), at ch.0/700km(left side), at ch.1/100km (right side)and atch.1/500km (left and right side),at ch.6/100km(right side) and atch.9/300km (right side) of arampadam branc
Read moreGeneral-mp-2025-26 renovation of field channel-ing from sluice at ch6/650 of kavilpad branch canal at ch 0/050 to ch 0/150 km-general civil work
Right bank canal (rbmc) ing from&#x0d malampuzha dam 0/000 km is up to 32/000 km&#x0d long and having main branch canals such as&#x0d puthupariyaram , kavilpad, vallikode i,&#x0d vallikode ii, kinavallur, thenur, mankurussi,&#x0d
Read moreof your Industry type