Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Light Weight Lithium Battery Tamping Machine.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106442045 |
|
Reference Number |
IF245704 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106442045/viewNitPdf_4679833.pdf |
| Start Date | August 13, 2024 23:01 |
| End Date |
Expired
26/08/2024
Expired 776 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of auto cables, lt wires, battery and welding cables
Procurement of auto cables, lt wires, battery and welding cables
Read moreHigh performance battery operated road sweeping machine to uas, gkvk-1no
High performance battery operated road sweeping machine to uas, gkvk-1no
Read moreTransportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years
Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreSupply of 15 nos 2v, 600ah of exide make vrla type spares batteries cells for station battery bank-1 including buy back discount at pjhep, revulapally.
Supply of 15 nos 2v, 600ah of exide make vrla type spares batteries cells for station battery bank-1 including buy back discount at pjhep, revulapally.
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreLight weight lithium battery tamping machine.
For complete deion and other details, please refer to tender
Read moreof your Industry type