Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Installation Construction Maintenance And Handing Over To Maintenance Body Of Rising Main Pump House Oht Distribution System All E And M Works Including Construction Of Tubewell And Other Appurtenant Works At Ladpur Khurd Wss
|
| Description |
Supply Installation Construction Maintenance And Handing Over To Maintenance Body Of Rising Main Pump House Oht Distribution System All E And M Works Including Construction Of Tubewell And Other Appurtenant Works At Ladpur Khurd Wss
|
| Organisation | Government of Uttarkhand |
| Tender Id | 2023_MDPEY_60734_1 |
|
Reference Number |
319/Nivida/07 dated 05.07.2023 |
| Tender Fee | 4720 |
| EMD | 2.2 Lakh |
| Tender Value | - |
| Place | Haridwar |
| Link |
View Original Tender Notice
https://uktenders.gov.in |
| Start Date | July 17, 2023 16:30 |
| End Date |
Expired
27/07/2023
Expired 1175 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tubewell 200mm id upto 110 mtr with direct rotary rig pump chamber ohsr 50000 ltr machinery upvc pipe line rising main etc for aug ws scheme ferozepur khurd and kunda block gharota distt pathankot under head nabard xxxi state share 4215
Tubewell 200mm id upto 110 mtr with direct rotary rig pump chamber ohsr 50000 ltr machinery upvc pipe line rising main etc for aug ws scheme ferozepur khurd and kunda block gharota distt pathankot under head nabard xxxi state share 4215
Read moreSurvey, design, laying, jointing, testing and commissioning of water distribution system in left over area of jabalpur i/c laying of distribution/rising main pipeline, construction of oht, house service connections and all allied works under ucf
Survey, design, laying, jointing, testing and commissioning of water distribution system in left over area of jabalpur i/c laying of distribution/rising main pipeline, construction of oht, house service connections and all allied works under ucf
Read moreSupply installation construction, maintenance and handing over to maintenance body of rising main pump house over head tank distribution system and other appurtenant works at ladpur khurd water supply scheme
Supply installation construction, maintenance and handing over to maintenance body of rising main pump house over head tank distribution system and other appurtenant works at ladpur khurd water supply scheme
Read moreConstruction maintenance and handing over to maintenance of horawala pumping water supply scheme block vikasnagar consisting of tubewell sump rising main supply main rcc cwr and distribution system and all other civil e and m appurtenant works
Construction maintenance and handing over to maintenance of horawala pumping water supply scheme block vikasnagar consisting of tubewell sump rising main supply main rcc cwr and distribution system and all other civil e and m appurtenant works
Read moreConstruction of 1500 kl oht, 02 tube wells, pump house, laying and jointing of rising main and all other appurtenant works specified in the boq of tender document including testing and commissioning and handing over of completed works to maintaining
Construction of 1500 kl oht, 02 tube wells, pump house and laying jointing pipe line
Read moreAgumentation installation of tubewell at wss village thethar kalan (railway crossing basti) block ghall khurd distt. ferozepur
Agumentation installation of tubewell at wss village thethar kalan (railway crossing basti) block ghall khurd distt. ferozepur
Read moreName of work 1. providing laying and fitting of rising main from tubewell to existing oht at durga nagar.
Name of work 1. providing laying and fitting of rising main from tubewell to existing oht at durga nagar.
Read moreConstruction maintenance and handing over to maintenance body of udpalta solar pumping goh water supply scheme of block kalsi
Construction maintenance and handing over to maintenance body of udpalta solar pumping goh water supply scheme of block kalsi
Read moreConfirmatory survey design construction laying jointing of sewer line 0.35 mld capacity stp and its appurtenant works including 6 months trail and run of complete system and handing over to maintenance body at district jail sudhhowala in dehradun
Confirmatory survey design construction laying jointing of sewer line 0.35 mld capacity stp and its appurtenant works including 6 months trail and run of complete system and handing over to maintenance body at district jail sudhhowala in dehradun
Read moreConstruction of tube wells pump house over head tank laying and jointing of rising main and distribution system of ladpur ring road phase 2 water supply scheme
Construction of tube wells pump house over head tank laying and jointing of rising main and distribution system of ladpur ring road phase 2 water supply scheme
Read moreof your Industry type