Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Confirmatory Survey Design Construction Laying Jointing Of Sewer Line 0.35 Mld Capacity Stp And Its Appurtenant Works Including 6 Months Trail And Run Of Complete System And Handing Over To Maintenance Body At District Jail Sudhhowala In Dehradun
|
Description |
Confirmatory Survey Design Construction Laying Jointing Of Sewer Line 0.35 Mld Capacity Stp And Its Appurtenant Works Including 6 Months Trail And Run Of Complete System And Handing Over To Maintenance Body At District Jail Sudhhowala In Dehradun
|
Organisation | Government of Uttarkhand |
Tender Id | 2023_MDPEY_65991_1 |
Reference Number |
Letter No 4276/NIVIDA/332, dated 25.11.2023 |
Tender Fee | 5900 |
EMD | 9 Lakh |
Tender Value | |
Place | Dehradun |
Link | https://uktenders.gov.in |
Start Date | December 10, 2023 20:30 |
End Date |
18/12/2023 ( Expired 557 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Confirmatory survey design construction and laying of sewer line connection to existing sewerage network testing and commissioning for devanchal vihar lower rajeev nagar and adjoing area sewerage scheme dehradun
Confirmatory survey design construction and laying of sewer line connection to existing sewerage network testing and commissioning for devanchal vihar lower rajeev nagar and adjoing area sewerage scheme dehradun
Read moreTender document for survey, soil investigation, design, supply, laying, construction and commissioning of sewer line of 72 km under kanadiya stp area and 1 no. ips and pumping main including house service connection as per scope of work with 10 ye
Tender document for survey, soil investigation, design, supply, laying, construction and commissioning of sewer line of 72 km under kanadiya stp area and 1 no. ips and pumping main including house service connection as per scope of work with 10 ye
Read moreSurvey, soil investigation, design, supply, laying, construction and commissioning of stp of 40 mld tigriya badshah and sewer line of 64 km and 1 no. ips of 30 mld and pumping main including house service connection as per scope of work with 10 y
Survey, soil investigation, design, supply, laying, construction and commissioning of stp of 40 mld tigriya badshah and sewer line of 64 km and 1 no. ips of 30 mld and pumping main including house service connection as per scope of work with 10 y
Read moreSurvey, soil investigation, design, supply, laying, construction and commissioning of stp of 80 mld dhankhedhi and sewer line of 163 km and 1 no. mps of 80 mld and pumping main including house service connection as per scope of work with 10 years
Survey, soil investigation, design, supply, laying, construction and commissioning of stp of 80 mld dhankhedhi and sewer line of 163 km and 1 no. mps of 80 mld and pumping main including house service connection as per scope of work with 10 years
Read moreConfirmatory survey design construction and laying of sewer line connection to existing sewerage network testing and commissioning including supply of all material labour tand p etc for haridwar bypass road in dehradun
Confirmatory survey design construction and laying of sewer line connection to existing sewerage network testing and commissioning including supply of all material labour tand p etc for haridwar bypass road in dehradun
Read moreProviding laying and jointing of main trunk sewer line of size 800 mm to 1200 mm dia with construction of manholes for prn (north) area to 30 mld stp nevta, under jurisdiction of ee phe-ii, jda, jaipur
Providing laying and jointing of main trunk sewer line of size 800 mm to 1200 mm dia with construction of manholes for prn (north) area to 30 mld stp nevta, under jurisdiction of ee phe-ii, jda, jaipur
Read moreSurvey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
Survey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.&#x0d &#x0d
Read moreLaying of temporary distribution system and its appurtenant work package 6 in sector 17 18 19 and 20 of mahakumbh mela
Laying of temporary distribution system and its appurtenant work package 6 in sector 17 18 19 and 20 of mahakumbh mela
Read moreLaying of temporary distribution system and its appurtenant work package 3 in sector 6 7 and 8 of mahakumbh mela
Laying of temporary distribution system and its appurtenant work package 3 in sector 6 7 and 8 of mahakumbh mela
Read moreLaying and jointing of hdpe di pipe construction of pond and its appurtenant work including its operation and maintenance during entire mela package 6 in sector 17 18 19 and 20 of mahakumbh mela
Laying and jointing of hdpe di pipe construction of pond and its appurtenant work including its operation and maintenance during entire mela package 6 in sector 17 18 19 and 20 of mahakumbh mela
Read moreof your Industry type