Tender Details

Particulars Details
Title
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery.
Description
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_332872_1
Reference
Number
ECL/GM/BA/E TENDER/24-25/ENM/480 Dt 18.03.2025
Tender Fee 0
EMD 14800
Tender Value
Place Shyamsundarpur Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345060
Start Date March 18, 2025 23:30
End Date

28/03/2025 ( Expired 71 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.

Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502

Read more
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)

Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)

Read more
Con of valley gutter godown no. 1 and 2 (wooden truss) into single span by tubular steel truss along with replacement of gi/asbestos sheet roofing with profile sheet roofing of godown no. 1, 2, mini shed, isolation shed at fsd darbhanga

Con of valley gutter godown no. 1 and 2 (wooden truss) into single span by tubular steel truss along with replacement of gi/asbestos sheet roofing with profile sheet roofing of godown no. 1, 2, mini shed, isolation shed at fsd darbhanga

Read more
Construction of g plus 2 barrack with attached bathroom having capacity of 20 25 personal with dining cum recreational hall, kitchen, store etc at police post khaltsi (by way of fitting of pipes and water storage tank). under sdp

Construction of g plus 2 barrack with attached bathroom having capacity of 20 25 personal with dining cum recreational hall, kitchen, store etc at police post khaltsi (by way of fitting of pipes and water storage tank). under sdp

Read more
Strengthening earthing and renovating earth pits of 3.3 kv substations no. 1/2/3, drive houses, pump house, silos, rls systems etc at silo section of dipka expansion project.

Strengthening earthing and renovating earth pits of 3.3 kv substations no. 1/2/3, drive houses, pump house, silos, rls systems etc at silo section of dipka expansion project.

Read more
Sinking of submerisble pump with water reserver cum structure and soak pit neal balai adak house at ilashpur harijan jl no 59 plot no 2056

Sinking of submerisble pump with water reserver cum structure and soak pit neal balai adak house at ilashpur harijan jl no 59 plot no 2056

Read more
Carrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl

Carrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl

Read more
Work contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.

Work contract for replacement of 220kv lighting arrestors along with modification on existing structure installed at unit no. 1 to 4, ph-i and ph-ii, 210mw, at sgtps, mppgcl, birsinghpur.

Read more
Creation of drainage channel for management of grey water by upgradation of pucca drain with cover and soak pit from ho manu molla to ho malek molla at sansad no viii/8 activity id 111896325

Creation of drainage channel for management of grey water by upgradation of pucca drain with cover and soak pit from ho manu molla to ho malek molla at sansad no viii/8 activity id 111896325

Read more
Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area

Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise