Particulars | Details |
---|---|
Title |
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery (Retender).
|
Description |
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery (Retender).
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_333403_1 |
Reference Number |
ECL/GM/BA/E TENDER/24-25/ENM/480(02) Dt 27.03.2025 |
Tender Fee | 0 |
EMD | 14800 |
Tender Value | |
Place | Shyamsundarpur Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345615 |
Start Date | March 27, 2025 23:30 |
End Date |
07/04/2025 ( Expired 82 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Read moreAssisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Read moreStrengthening earthing and renovating earth pits of 3.3 kv substations no. 1/2/3, drive houses, pump house, silos, rls systems etc at silo section of dipka expansion project.
Strengthening earthing and renovating earth pits of 3.3 kv substations no. 1/2/3, drive houses, pump house, silos, rls systems etc at silo section of dipka expansion project.
Read moreConstruction of protective roof at no 2 and 3 pit at e.s.p unit of shyamsundarpur colliery.
Construction of protective roof at no 2 and 3 pit at e.s.p unit of shyamsundarpur colliery.
Read moreTotal 16 nos of flexible trailing cable joint for sdl and udm trailing cable of 25 sqmm, 5 core, 1.1 kv grade for safe and smooth and safe sdl loading operation at pit no. b and 2 under pandaveswar colliery, pandaveswar area
Total 16 nos of flexible trailing cable joint for sdl and udm trailing cable of 25 sqmm, 5 core, 1.1 kv grade for safe and smooth and safe sdl loading operation at pit no. b and 2 under pandaveswar colliery, pandaveswar area
Read moreReplacement of existing acsr conductor by arial bunch cable with supply and erection of associate material at villages at shanti dham pull no.2 etc. under edsd vikasnagar under edd vikasnagar
Replacement of existing acsr conductor by arial bunch cable with supply and erection of associate material at villages at shanti dham pull no.2 etc. under edsd vikasnagar under edd vikasnagar
Read morePainting of head gear structure, trammer shed post only etc. at pit no.02 of dhemomain pit colliery under sodepur area.
Painting of head gear structure, trammer shed post only etc. at pit no.02 of dhemomain pit colliery under sodepur area.
Read morePainting of head gear structure of pit no.01 and pit no.03 at mithani colliery under sodepur area.
Painting of head gear structure of pit no.01 and pit no.03 at mithani colliery under sodepur area.
Read moreTransportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Read moreScrapping priming painting of head gear of pit no.03 at j.k.nagar colliery under satgram-sripur area
Scrapping priming painting of head gear of pit no.03 at j.k.nagar colliery under satgram-sripur area