Tender Details

Particulars Details
Title
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery (Retender).
Description
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery (Retender).
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_333403_1
Reference
Number
ECL/GM/BA/E TENDER/24-25/ENM/480(02) Dt 27.03.2025
Tender Fee 0
EMD 14800
Tender Value
Place Shyamsundarpur Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345615
Start Date March 27, 2025 23:30
End Date

07/04/2025 ( Expired 14 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.

Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.

Read more
Construction and new fabrication with assembly of 90 kw drive head unit and drive base frame material carrying and transporting at different place of ug site to surface at shyamsundarpur colliery under bankola area (retender).

Construction and new fabrication with assembly of 90 kw drive head unit and drive base frame material carrying and transporting at different place of ug site to surface at shyamsundarpur colliery under bankola area (retender).

Read more
Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery (retender).

Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery (retender).

Read more
Making of gun metal bush for head gear pulley of pit no 2 and pit no 3 of shyamsundarpur colliery under bankola area.

Making of gun metal bush for head gear pulley of pit no 2 and pit no 3 of shyamsundarpur colliery under bankola area.

Read more
Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery.

Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery.

Read more
Servicing and resetting of automatic contrivance of no 1 pit steam winder at nkj unit and no 2 pit electical winder at vk unit khandra colliery (retender).

Servicing and resetting of automatic contrivance of no 1 pit steam winder at nkj unit and no 2 pit electical winder at vk unit khandra colliery (retender).

Read more
Renovation strengthening of head gear structure with all girders and joints gusplate riveting change of pit no. 3 of shyamsundarpur colliery under bankola area.

Renovation strengthening of head gear structure with all girders and joints gusplate riveting change of pit no. 3 of shyamsundarpur colliery under bankola area.

Read more
Installation of 03 nos guide rope 32 mm dia at north east of north cage and south east of north cage at no 3 pit of nkj unit and north west of west cage at no 2 pit of vk unit khandra colliery (retender).

Installation of 03 nos guide rope 32 mm dia at north east of north cage and south east of north cage at no 3 pit of nkj unit and north west of west cage at no 2 pit of vk unit khandra colliery (retender).

Read more
Construction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery (retender).

Construction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery (retender).

Read more
Lifting and lowering of 04 nos submersible pumps 120m head, 500gpm pullen and ksb make complete with power cable and 6inch ms pipe at pit no. 2 and real kajora of naba kajora colliery

Lifting and lowering of 04 nos submersible pumps 120m head, 500gpm pullen and ksb make complete with power cable and 6 inch ms pipe at pit no. 2 and real kajora of naba kajora colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise