Tender Details
Particulars | Details |
---|---|
Title |
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery (Retender).
|
Description |
Stabilization Of Head Gear Structure Of Pit No 2 By Renovating Modification Strengthening Of Head Gear Structure With All Girders And Joint Rusted Plate Riveting Change Etc. At Pit No 2 Of Shyamsundarpur Colliery (Retender).
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_333403_1 |
Reference Number |
ECL/GM/BA/E TENDER/24-25/ENM/480(02) Dt 27.03.2025 |
Tender Fee | 0 |
EMD | 14800 |
Tender Value | |
Place | Shyamsundarpur Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345615 |
Start Date | March 27, 2025 23:30 |
End Date |
07/04/2025 ( Expired 14 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Read moreConstruction and new fabrication with assembly of 90 kw drive head unit and drive base frame material carrying and transporting at different place of ug site to surface at shyamsundarpur colliery under bankola area (retender).
Construction and new fabrication with assembly of 90 kw drive head unit and drive base frame material carrying and transporting at different place of ug site to surface at shyamsundarpur colliery under bankola area (retender).
Read moreStabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery (retender).
Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery (retender).
Read moreMaking of gun metal bush for head gear pulley of pit no 2 and pit no 3 of shyamsundarpur colliery under bankola area.
Making of gun metal bush for head gear pulley of pit no 2 and pit no 3 of shyamsundarpur colliery under bankola area.
Read moreStabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery.
Stabilization of head gear structure of pit no 2 by renovating modification strengthening of head gear structure with all girders and joint rusted plate riveting change etc. at pit no 2 of shyamsundarpur colliery.
Read moreServicing and resetting of automatic contrivance of no 1 pit steam winder at nkj unit and no 2 pit electical winder at vk unit khandra colliery (retender).
Servicing and resetting of automatic contrivance of no 1 pit steam winder at nkj unit and no 2 pit electical winder at vk unit khandra colliery (retender).
Read moreRenovation strengthening of head gear structure with all girders and joints gusplate riveting change of pit no. 3 of shyamsundarpur colliery under bankola area.
Renovation strengthening of head gear structure with all girders and joints gusplate riveting change of pit no. 3 of shyamsundarpur colliery under bankola area.
Read moreInstallation of 03 nos guide rope 32 mm dia at north east of north cage and south east of north cage at no 3 pit of nkj unit and north west of west cage at no 2 pit of vk unit khandra colliery (retender).
Installation of 03 nos guide rope 32 mm dia at north east of north cage and south east of north cage at no 3 pit of nkj unit and north west of west cage at no 2 pit of vk unit khandra colliery (retender).
Read moreConstruction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery (retender).
Construction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery (retender).
Read moreLifting and lowering of 04 nos submersible pumps 120m head, 500gpm pullen and ksb make complete with power cable and 6inch ms pipe at pit no. 2 and real kajora of naba kajora colliery
Lifting and lowering of 04 nos submersible pumps 120m head, 500gpm pullen and ksb make complete with power cable and 6 inch ms pipe at pit no. 2 and real kajora of naba kajora colliery
Read moreof your Industry type