Tender Details
Particulars | Details |
---|---|
Title |
Aden/Sklr Sub Division: Rebuilding Of Side Slope And Side Drain Construction At Land Slip At Km.40/300 400 And Slope Protection Works On Vulnerable Cutting At Km 39/835 40/450 Between Bllt And Sklr Stations (Phase Ii).
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79409562 |
Reference Number |
01MYS25of15-01-25itemno2 |
Tender Fee | 0 |
EMD | 6.23 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79409562/viewNitPdf_4826177.pdf |
Start Date | January 15, 2025 18:21 |
End Date |
07/02/2025 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Read moreConstruction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Construction of rob at km 1/8 of namakkal bypass road km 0/8-2/2 incl. railway portion at railway km 47/5-6 in between kalangani and namakkal railway stations in sa-krr section in the main work of forming bypass to namakkal town km 0/8-6/0 (phase-ii)
Read moreConstruction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreHubballi division: londa-vasco (ld-vsg): rebuilding of br. no.75 and associated protection works such as flooring, pitching, tunnel portal extension, slope stabilization, retaining wall, side drain, etc. at the landslide spot (km 28/800-29/000) between tunnel no.2 & 3 in castlerock-canranzol (clr-crz) section.(two packet system)
For complete deion and other details, please refer to tender
Read moreAden/sklr sub division:- rebuilding of side slope and side drain construction at land slip at km.40/300-400 and slope protection works on vulnerable cutting at km 39/835 - 40/450 between bllt and sklr stations (phase ii).
For complete deion and other details, please refer to tender
Read moreHubballi division-sw-i-protection of track from falling of boulders from vertical cuttings by provision of boulder netting in londa-vasco (ld-vsg) section at in between km 29/300 to 40/100. sw-ii-stabilization of vulnerable cutting slopes by provision of wire mesh with turf reinforcement mat along with self drilling anchor and rock fall barriers in castlerock-kulem(clr-qlm) section. (special conditions to be follow)
For complete deion and other details, please refer to tender
Read moreCutting side slope protection with gabion wall,rcc drain between km.608/6-8 east and west side and other locations, km.644/5-6 east, km.650/4-5 e/w, km.648/9-0 under sse/p/btjl section.
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : sw i : slope stabilization by wire netting of slopes in cuttings from km 48/600-700, 49/000-100 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw ii : slope stabilization by wire netting of slopes in cuttings from km 49/200-340 between thoppur (tpp) and muttampatti (mpc) stations in sse/pway/dpj(s) section. sw iii : slope stabilization by wire netting of slopes in cuttings from km 50/100-300 between thoppur (tpp) and muttampatti (mp
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreHubballi division: badami-hotgi (bdm-hg): improvement to lhs no.88 (br no. 79-b) at km 203/300-400 between aliyabad-minchanal (ayb mnl) stations and retaining wall, approach road and height guage in aden/bjp sub division. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreof your Industry type