Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement To Road From M.S.H.6 To Kondigare Jambali Takawade Abdulat Road Mdr 108 Km 4/500 To 6/200 Tal Shirol Dist. Kolhapur
|
Description |
Improvement To Road From M.S.H.6 To Kondigare
Jambali Takawade Abdulat Road Mdr 108 Km 4/500 To 6/200 Tal Shirol
Dist. Kolhapur
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWDRP_937381_13 |
Reference Number |
46 for 2023-24 (B1) (OPEN) |
Tender Fee | 2360 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Superintending Engineer, P.W. Circle, Kolhapur |
Link | https://mahatenders.gov.in |
Start Date | August 23, 2023 00:25 |
End Date |
15/09/2023 ( Expired 650 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreAAAAAAAAAA
Login to viewImprovement of mohadi akrale talegaon road ch 0.00 to 2/500 odr 197 tal dindori dist nashik
Read moreImprovement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)
Improvement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)
Read moreWidening and strengthening sunel to karodiya, unhel to osav to pirawa via odiya kheri to kotri to govindpura, karawan via dhaturiya bani. singhpura up to mp border from km. 60/150 to 70/500 including 1 no submersible bridge (mdr-377).
Widening and strengthening sunel to karodiya, unhel to osav to pirawa via odiya kheri to kotri to govindpura, karawan via dhaturiya bani. singhpura up to mp border from km. 60/150 to 70/500 including 1 no submersible bridge (mdr-377).
Read moreImprovement of khatkhatia-baulasingha road from 0/000 km to 11/835 km in the district of boudh under state plan
Improvement of khatkhatia-baulasingha road from 0/000 km to 11/835 km in the district of boudh under state plan
Read moreof your Industry type